Normative Table 1 Sample Clauses

Normative Table 1. Applicable P&ID’s Drawing Number Description 0.45/25538 Xxxxx Power Station Anion and Cation vessels for Demin Plant 0.45/26969 General arrangement main silo tops 0.45/ 27052 Layout top part main silos 0.45/27011 Main silo complex
AutoNDA by SimpleDocs

Related to Normative Table 1

  • Table 1b Allocation of Commonwealth supported places for designated courses of study for 20191 Cluster No. Funding cluster Number of designated undergraduate places (excluding medical places) for 2019 grant year (EFTSL)2 Number of undergraduate medical places for 2019 grant year (EFTSL) Number of non- research postgraduate places (excluding medical places) for 2019 grant year (EFTSL) Number of postgraduate medical places for 2019 grant year (EFTSL)3 Total number of Commonwealth supported places for 2019 grant year (EFTSL) 1 Law, accounting, administration, economics, commerce 340 0 25 0 365 5 Clinical psychology, allied health, foreign languages, visual and performing arts 19 0 95 0 114 6 Nursing 0 0 215 0 215 8 Medicine, dentistry, veterinary science, agriculture 0 0 5 444 449 Total 360 0 875 444 1679 NOTES:

  • Table 4 Ending this Addendum when the Approved Addendum Changes Which Parties may end this Addendum as set out in Section 19: Importer Exporter Ending this Addendum when the Approved Addendum changes Part 2: Mandatory Clauses Entering into this Addendum

  • Table 1 4 If ‘Yes’ to any then you are likely required to carry out a DPIA under Article 35 GDPR. If ‘No’, to all then a DPIA may not be required. 1 xxxxx://xxx-xxx.xxxxxx.xx/legal-content/EN/TXT/?uri=CELEX:02016R0679-20160504

  • Table 3 Appendix Information

  • Table 2 Software Subscription Use Case OpenShift Enterprise OpenShift Enterprise Broker Infrastructure OpenShift Enterprise is intended to be used as a platform as a service and will be supported only when used in that capacity. OpenShift Enterprise is not supported on non-server hardware such as desktops or workstations. OpenShift Enterprise is intended for use on a dedicated Physical Node or Virtual Guest; running other applications and/or programs of any type on the Physical Node or Virtual Guest can have a negative impact on the function and/or performance. Red Hat JBoss Enterprise Application Platform for OpenShift and/or Red Hat JBoss EAP for xPaaS will be supported in accordance with the terms of Exhibit 1.B.

  • Minimum Shipping Requirements for TIPS Sales Vendor shall ship, deliver, or provide ordered goods and services within a commercially reasonable time after acceptance of the order. If a delay in delivery is anticipated, Vendor shall notify the TIPS Member as to why delivery is delayed and provide an updated estimated time for completion. The TIPS Member may cancel the order if the delay is not commercially acceptable or not consistent with the Supplemental Agreement applicable to the order.

  • Table 2 (definition of “Casino Gross Revenue”) 15(e) 2 (definition of “Commissioning”) 19 2 (definition of “Committee’s Nominated Representative) 20(1) 6(1)(c) 20(2) 7(8)(a) 21(d) 11(1) 21(e) 11(2) 22(2) 11(3) 23(b) 14(d) 33(2) 15(a)(B) 35(1) 15(b)(i) 35(2) 15(c) 36(b) 15(d) 36(c)

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Basic Provisions This Article contains the basic lease provisions between Landlord and Tenant.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.