New electricity connection Sample Clauses

New electricity connection. If you move into the premises and it does not already have an existing electricity connection, then we will sell you electricity from the day that Western Power Networks connects the premises to the network and energises the premises.
AutoNDA by SimpleDocs
New electricity connection. You must apply to us before we will supply electricity to a supply address without an existing connection. We do not have to supply electricity to you unless: [a] adequate electricity supply is available at the boundary of the supply address; and [b] your equipment complies with relevant regulations; and [c] a meter is installed at the supply address and available for our use; and [d] any other requirements under relevant regulations are met and the network operator can provide electricity supply to you, and undertake the new connection. If the above conditions are met, we will do our best to arrange for the network operator to connect you to a new electricity connection at a new supply address within the usual period required by the network operator or at a later time agreed with you, where: [a] you have applied and provided us with acceptable identification; and [b] if you are a residential customer and the supply address is a rental property, you have provided us with contact details of the property’s owner or agent; and [c] you have agreed to pay all relevant prices and fees; and [d] you have provided us with contact details for billing; and [e] you have provided security if we have required it [see clause 16.3 below]; and [f] you have no outstanding debt relating to the supply of electricity by us [other than debt which is either the subject of a dispute or for which we have agreed to an alternative payment plan with you]; and [g] you have arranged for us to be provided with any notices and other information that we have requested. We will charge you for electricity used at the supply address from the date electricity is turned on at the supply address.
New electricity connection. If you move into the premises, or the premises under this contract is changed pursuant to clause 23.9(a) of this contract, and it does not already have an existing electricity connection, then we will sell you electricity from the day that Western Power Networks connects the premises to the network and energises the premises.

Related to New electricity connection

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Connections HTC”s responsibility for service ends at the demarcation point. “Demarcation” means the point of meeting where the “hand-off” occurs between HTC’s system and Customer’s system. Facilities used by HTC in providing Services may be connected with terminal equipment or communications systems provided by Customer. In such a case, facilities and terminal equipment or communications systems provided by Customer or its customers shall be subject to mutually agreeable technical interface specifications.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Reconnection The Parties shall cooperate with each other to restore the Small Generating Facility, Interconnection Facilities, and the New York State Transmission System and Distribution System to their normal operating state as soon as reasonably practicable following a temporary disconnection.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

  • Disconnection Upon termination of this Agreement, Developer and Connecting Transmission Owner will take all appropriate steps to disconnect the Developer’s Large Generating Facility from the New York State Transmission System. All costs required to effectuate such disconnection shall be borne by the terminating Party, unless such termination resulted from the non-terminating Party’s Default of this Agreement or such non-terminating Party otherwise is responsible for these costs under this Agreement.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.