Network Upgrade Facilities 1 Sample Clauses

Network Upgrade Facilities 1. B The Affected System Upgrade Facilities include the following elements of the Network Upgrade Facilities: • Replacement of 1033.5 MCM ACSR strain bus rated 208 MVA within the east yard of Affected System Operator’s Alcoa Substation with either 1590 MCM AAC conductor rated 267 MVA or a 1510.5 MCM AAC rated 259 MVA which will be marginally sufficient or an electrically equivalent conductor, subject to a NYISO determination that an alternative conductor does not constitute a material modification; • Replacement of 1192.5 MCM ACSR tie rated 227 MVA between the west yard of Connecting Transmission Owner’s Alcoa Substation and the east yard of Affected System Operator’s Alcoa Substation with either 1590 MCM AAC conductor rated 267 MVA or a 1510.5 MCM AAC rated 259 MVA which will be marginally sufficient or an electrically equivalent conductor, subject to a NYISO determination that an alternative conductor does not constitute a material modification; and • Depending on the conductor type, structural modifications may be required. In such a case, these will consist of new structural frames to be detached from the existing substation structure which will support the new electrical equipment and conductors. The new frames will be constructed beside each of the existing substation bays and will be built from steel HSS members to minimize the surface area from wind action and ice accumulation.
AutoNDA by SimpleDocs

Related to Network Upgrade Facilities 1

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Network Facilities At the time of termination, the Transmission Provider and the Interconnected Entities shall keep in place any portion of the Interconnection Facilities that the Transmission Provider deems necessary for the safety, integrity and/or reliability of the Transmission System. Otherwise, Transmission Provider may, in its discretion, within 30 days following termination of Interconnection Service, require the removal of all or any part of the Interconnection Facilities.

  • Network Access TENANT may find it necessary to purchase a network interface card, wireless PC card or other hardware in order to connect to the internet service. LANDLORD is not responsible for the purchase of these items and LANDLORD cannot guarantee compatibility with any device TENANT may have. The computer and network card must have software installed that supports the Internet Protocol commonly referred to as TCP/IP. Any conflicts between the software compatibility of the network and the TENANT’S computer operating system or any other feature will be the responsibility of the TENANT to resolve. LANDLORD will not be responsible for software issues related to the user’s personal computer.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.