Net Energy for Load Sample Clauses

Net Energy for Load. “Net Energy for Load” shall mean net generation of an electric system plus energy received from others less energy delivered to others through interchange. It includes system losses, but excludes energy required for storage of energy at energy storage facilities. Calculations of net energy for load for all purposes under these Bylaws shall be based on the most recent calendar year for which data on net energy for load of the Region is available.
AutoNDA by SimpleDocs
Net Energy for Load. The electrical energy requirements of an electric system are defined as system net generation plus energy received from others, less energy delivered to others through interchange. It includes system losses but excludes energy required for the storage at energy storage facilities.

Related to Net Energy for Load

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Renewable Energy Credits 5.01. Customer shall offer PMPA and/or Utility a first right of refusal before selling or granting to any third party the right to the Green Attributes associated with its customer-owned renewable generation that is interconnected to Utility’s electric distribution system. The term Green Attributes shall include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of electricity from the customer owned-renewable generation and its displacement of conventional energy generation.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from iNetworks to Verizon, iNetworks, at iNetworks’ own expense, shall:

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-025-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Logistics The Licensee shall be responsible for:

Time is Money Join Law Insider Premium to draft better contracts faster.