NERC’s and SERC’s Response Sample Clauses

NERC’s and SERC’s Response. 99. NERC and SERC propose to revise section 7.1 of the SERC bylaws (addressing the authority of the SERC compliance committee). Specifically, in addition to the existing authority, which provides that the compliance committee shall recommend to the SERC board such actions as may further the purposes of the SERC Delegation Agreement, NERC and SERC propose to add: “[or] that extend beyond the scope of authority delegated to a Hearing Body in [revised] section 7.3.” 100. Section 7.3, as revised, states that the compliance committee shall conduct hearings in accordance with hearing procedures approved by the Commission and that in compliance hearings in which an entity may contest a finding of an alleged violation, a proposed mitigation plan, a remedial action directive, or any other action that may be taken by the hearing body, the compliance committee shall establish and maintain a hearing body with authority to conduct and render decisions on the matter. Section 7.3, as proposed, also establishes quorum, sector control and voting requirements applicable to the SERC hearing body and further provides that the decisions of the hearing body shall be final and binding on SERC.49 48 March 21 Order, 122 FERC ¶ 61,245 at P 200. 49 NERC and SERC also propose to make corresponding revisions to section 2.0 of the SERC Exhibit D. Docket No. RR06-1-016, et al. -34-
AutoNDA by SimpleDocs
NERC’s and SERC’s Response. 197. NERC and SERC state that the SERC Delegation Agreement has been revised, consistent with the requirements of the April 19 Order. In addition, NERC and SERC state that additional revisions have been made. SERC’s Exhibit D, at section 2.0, states that the SERC hearing body will be composed of the SERC board’s compliance committee, or a subset of that committee, as appointed by the committee chairman, provided that: (i) the hearing body will comprise a minimum of 50 percent of the committee members or their designated alternates and (ii) no two sectors can control and no one sector can veto the actions of the hearing body.

Related to NERC’s and SERC’s Response

  • Government’s Response Please refer to the Q&A from the first question.

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

  • Timely and Sustained Response Interconnection Customer shall ensure that the Small Generating Facility’s real power response to sustained frequency deviations outside of the deadband setting is automatically provided and shall begin immediately after frequency deviates outside of the deadband, and to the extent the Small Generating Facility has operating capability in the direction needed to correct the frequency deviation. Interconnection Customer shall not block or otherwise inhibit the ability of the governor or equivalent controls to respond and shall ensure that the response is not inhibited, except under certain operational constraints including, but not limited to, ambient temperature limitations, physical energy limitations, outages of mechanical equipment, or regulatory requirements. The Small Generating Facility shall sustain the real power response at least until system frequency returns to a value within the deadband setting of the governor or equivalent controls. An Applicable Reliability Standard with equivalent or more stringent requirements shall supersede the above requirements.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Firm Response The Department should make an award within sixty (60) days after the date of the opening, during which period responses shall remain firm and shall not be withdrawn. If award is not made within sixty (60) days, the response shall remain firm until either the Department awards the Contract or the Department receives from the bidder written notice that the response is withdrawn. Any response that expresses a shorter duration should, in the Department's sole discretion, be accepted or rejected.

  • Agency Response a. OGS will consider all information relevant to the Formal Dispute, and may, in its discretion, suspend, modify, or cancel the disputed procurement/Contract action prior to issuance of a Formal Dispute decision.

  • Spill Responsibility PURCHASER will be held responsible for any and all releases of environmental pollution during performance of the contract which occur as a result of, or are contributed by, actions of its agent, personnel, or subcontractors. PURCHASER agrees to promptly dispose of such spills or leaks to satisfaction of the STATE and proper regulatory agencies in a manner that complies with applicable federal, state, and local laws and regulations. Cleanup shall be at no cost to the STATE. PURCHASER shall obtain the STATE's written consent prior to bringing onto the areas of operations any

  • Lobbying Activities - Standard Form - LLL No response Do not upload this form unless Vendor has reportable lobbying activities. There are Attributes entitled, “2 CFR Part 200 or Federal Provision - Xxxx Anti-Lobbying Amendment – Continued.” Properly respond to those Attributes and only upload this form if applicable/instructed. If upload is required based on your response to those Attributes, the Disclosure of Lobbying Activities – Standard Form - LLL must be downloaded from the “Attachments” section of the IonWave eBid System, reviewed, properly completed, and uploaded to this location.

  • Incident Response Operator shall have a written incident response plan that reflects best practices and is consistent with industry standards and federal and state law for responding to a data breach, breach of security, privacy incident or unauthorized acquisition or use of any portion of Data, including PII, and agrees to provide LEA, upon request, an executive summary of the written incident response plan.

Time is Money Join Law Insider Premium to draft better contracts faster.