MISSED SPECIAL TRIP Sample Clauses

MISSED SPECIAL TRIP. If Contractor fails or refuses to perform Services for an entire or any portion of a Special Trip, Contractor shall pay to FCSS an amount equivalent to the greater of the total costs that Contractor is charging for the Special Trip or the actual costs incurred by FCSS to provide transportation services for the Special Trip (“Missed Special Trip Charge”) plus 20 percent of the Missed Special Trip Charge.
AutoNDA by SimpleDocs

Related to MISSED SPECIAL TRIP

  • Porcupine Site Highway 11

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • TREE TRIMMING The Licensee shall have authority to trim trees upon and overhanging public streets, alleys, sidewalks and ways and places of the Town so as to prevent the branches of such trees from coming in contact with the wires, cables and equipment of the Licensee, in accordance with applicable state law and any Town bylaws/ordinances and regulations.

  • Cyber incident damage assessment activities If DoD elects to conduct a damage assessment, the Contracting Officer will request that the Contractor provide all of the damage assessment information gathered in accordance with paragraph (e) of this clause.

  • Surface Treatments The Project Area is covered by a layer of mulch permeable to air and water, including, but not limited to rock, bark, ungrouted stepping stones and artificial turf manufactured to be permeable or a high- density planting of living groundcover plants. There are no impermeable barriers that would inhibit the passage of air and/or water to the soil. APN: 161-06-701-001 When Recorded, Return To: Southern Nevada Water Authority Conservation Division P.O. Box 99956 MS 110 Las Vegas, Nevada 89193-9956 EXHIBIT “D” CONSERVATION EASEMENT This Grant of Conservation Easement (“Easement”) is made by the Xxxxx County School District, a political subdivision of the State of Nevada, as the grantor, (“Owner”) and the Southern Nevada Water Authority (“Authority”), a political subdivision of the State of Nevada, as the holder.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • University-Supported Efforts (1) If the work was not made in the course of independent efforts, the work is the property of the University and the employee shall share in the proceeds therefrom.

Time is Money Join Law Insider Premium to draft better contracts faster.