Minimum Wayleave Widths – Underground Cables Sample Clauses

Minimum Wayleave Widths – Underground Cables. 10kV/20kV – 2m corridor (1m either side of the cable) 38kV – 4m corridor (2m either side of the cable) 110kV Single Circuit 4m (centred on the trefoil group) 110kV Double Circuit 5m (centred between trefoil groups which are at 500mm centres) 220kV Single Circuit 4m (centred on centre phase) 220kV Double Circuit (this situation doesn't normally arise as these circuits would normally require 4m separation) Where two circuits are required with 4m separation the wayleave width will be 8m total. This allows for 4m separation between circuits and an additional 2m either side of the circuit to allow for future jointing, maintenance etc. Where three circuits are required the wayleave will be 12m and so on. Annex 2 Deed A Acquisition of Overhead Easement by agreement between the Customer and landowner [Easement for Contestable Line – Overhead Line] LAND REGISTRY COUNTY FOLIO DEED dated made the day of 20 BETWEEN
AutoNDA by SimpleDocs

Related to Minimum Wayleave Widths – Underground Cables

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Workplace Safety Insurance Benefits (WSIB) Top Up Benefits If the employee is in a class of employees that, on August 31, 2012, was entitled to use unused sick leave credits for the purpose of topping up benefits received under the Workplace Safety and Insurance Act, 1997;

  • Annual Leave Loading (a) In addition to their ordinary pay, an employee, other than a shiftworker, will be paid an annual leave loading of 17.5% of their ordinary pay on a maximum of 152 hours/four weeks annual leave per annum.

  • CONDITIONS FOR EMERGENCY/HURRICANE OR DISASTER - TERM CONTRACTS It is hereby made a part of this Invitation for Bids that before, during and after a public emergency, disaster, hurricane, flood, or other acts of God that Orange County shall require a “first priority” basis for goods and services. It is vital and imperative that the majority of citizens are protected from any emergency situation which threatens public health and safety, as determined by the County. Contractor agrees to rent/sell/lease all goods and services to the County or other governmental entities as opposed to a private citizen, on a first priority basis. The County expects to pay contractual prices for all goods or services required during an emergency situation. Contractor shall furnish a twenty-four (24) hour phone number in the event of such an emergency.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

Time is Money Join Law Insider Premium to draft better contracts faster.