Minimum dimensions Sample Clauses

Minimum dimensions. 5.6.3.1. The several kinds of exits shall have the following minimum dimensions of free access: Class I Class II Class III Remarks Service door Door aperture Height (cm) 180 165 --- Width (cm) Single door : 65 Double door : 120 This dimension may be reduced by 10 cm when the measurement is made at the level of the hand- holds. The required width of free access shall be ensured in the height of 70 to 160 cm related to the level of the first step (see Annex 3, figure 12) Emergency door Height (cm) 125 --- Width (cm) 00 Xxxxxxxxx xxxxxx Xxxx (xx0) 4,000 It shall be possible to inscribe in this area a rectangle 50 cm high and 70 cm wide. Emergency window situated in the rear face of the vehicle, if the manufacturer does not provide an emergency window of the minimum dimensions prescribed above. It shall be possible to inscribe in the emergency window aperture a rectangle 35 cm high and 155 cm wide. The corners of the rectangle may be rounded to a radius of curvature not exceeding 25 cm. Escape hatch Aperture area (cm2) 4,000 It shall be possible to inscribe in this area a rectangle measuring 50 x 70 cm
AutoNDA by SimpleDocs
Minimum dimensions. The perforated pipe should be designed with a 12 inch minimum pipe diameter and a three 3 foot minimum trench width. The perforated pipe should be located within the trench section to minimize the accumulation of sediment in the aggregate void storage and maximize the preservation of this storage for stormwater treatment. To meet this goal, it is recommended that the perforated pipe be located at or within 6 inches of the trench bottom. The maximum trench width will be limited by the rate at which stormwater can effectively fill the void storage within the trench.
Minimum dimensions. 5.6.3.1. The several kinds of exits shall have the following minimum dimensions: (see also Annex 3, figure 17):
Minimum dimensions. 5.6.3.1. The several kinds of exits shall have the following minimum dimensions: (see also annex 3, figure 17): 4/ In the country in which the vehicle is licensed for operation.
Minimum dimensions. 6.1 As soon as the Developer’s Works have reached such a stage that all of the Minimum Dimensions can be accurately measured (and in any event prior to the issue of the Certificate of Practical Completion), the Developer and LUL are jointly to carry out an inspection of the Developer’s Works to measure the Minimum Dimensions.
Minimum dimensions. 5.6.3.1. The several kinds of exits shall have the following minimum dimensions: (see also annex 3, figure 17): 5/ An objective method of verifying that this requirement is satisfied may be established for the use of testing laboratories. Aperture Dimensions Remarks Service door Entry height: Class A 165 cm Class B 150 cm The service door entry height shall be measured as the vertical distance, measured on a vertical plane of the horizontal projections of the mid point of the door aperture and the top surface of the lowest step.
Minimum dimensions. Residents erected on said lots shall contain the following minimum square feet of floor space:
AutoNDA by SimpleDocs
Minimum dimensions. Trench or Open Ditch Installation Nominal Diameter Minimum Thickness Minimum Cover Min. Trench Width 18" 6" 12" 36" 24" 6" 12" 42" 30" 6" 12" 48" 36" 6" 12" 54" Trench Installation Open Ditch Installation Gravel or Compacted Soil

Related to Minimum dimensions

  • Minimum Data Necessary Shared The Provider attests that the Student Data request by the Provider from the LEA in order for the LEA to access the Provider’s products and/or services is limited to the Student Data that is adequate, relevant, and limited to what is necessary in relation to the K-12 school purposes for which it is processed.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Time is Money Join Law Insider Premium to draft better contracts faster.