Common use of Meteorological Data Reporting Requirement Clause in Contracts

Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County SCHEDULE D SINGLE-LINE DIAGRAM IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1-086) Transmission Provider: PJM Interconnection, L.L.C. Manager, Interconnection Projects By:_ 12/16/2021 Name Title Date Printed name of signer:_Jason Xxxxxxxxx Interconnection Customer: CPV Rogue’s Wind, LLC EVP By:_ 12/6/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate Transmission, LLC Dir FERC & RTO Support 12/16/2021 By:_ Name Title Date Printed name of signer:_Greg Xxxxxxx

Appears in 1 contract

Samples: Original Service Agreement

AutoNDA by SimpleDocs

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not Required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AC1-086167) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects By:_ 12/16/2021 Proje6c/t6s/2022 Name Title Date Xxxxx Xxxxxxxxx Printed name of signer:_Jason Xxxxxxxxx signer: Interconnection Customer: CPV Rogue’s WindMark Center Solar Project, LLC EVP By:_ 12/6/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate Transmission, LLC Dir FERC & RTO Support 12/16/2021 Vice president 4/28/2022 By:_ Name Title Date Xxxxx San Xxxxxxxx, Vice President Printed name of signer:_Greg Xxxxxxxsigner: Interconnected Transmission Owner: AEP Ohio Transmission Company, Inc. By:_ Vice President 5/28/2022 Name Title Date Xxxxxx X. Xxxxxxx Printed name of signer:

Appears in 1 contract

Samples: Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not Required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AB2-086085) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects Projects11/23/2021 Name Title Date Xxxxx Xxxxxxxxx Printed name of signer: _ Interconnection Customer: XXXXX Xxxxx Branch Solar LLC By:: _ 12/16/2021 Authorized Signatory 9/21/2021 Name Title Date Printed name of signer:_Jason Xxxxxxxxx Interconnection Customersigner: CPV Rogue’s WindXxxx Xxxxxx Interconnected Transmission Owner: AEP Ohio Transmission Company, LLC EVP Inc. By:: _ 12/6/2021 Vice President 11/15/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer: Xxxxxx X. Xxxxxxx portion of the Interconnection Facilities as the Interconnected Transmission Owner: Mid-Atlantic Interstate Transmission, LLC Dir FERC & RTO Support 12/16/2021 By:_ Name Title Date Printed name of signer:_Greg XxxxxxxOwner is responsible for building.

Appears in 1 contract

Samples: Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AC1-086001) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects By:_ 12/16/2021 Projects9/27/2021 Name Title Date Printed name of signer:_Jason signer: Xxxxx Xxxxxxxxx Interconnection Customer: CPV Rogue’s Wind, Salt City Solar LLC EVP By:_ 12/6/2021 Authorized Signatory 7/26/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer: Xxxx Xxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate TransmissionAEP Ohio Transmission Company, LLC Dir FERC & RTO Support 12/16/2021 Inc. By:_ Vice President 9/24/2021 Name Title Date Printed name of signer:_Greg signer: Xxxxxx X. Xxxxxxx

Appears in 1 contract

Samples: Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not Required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AD1-086119) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects By:_ 12/16/2021 Projects7/6/2021 Name Title Date Printed name of signer:_Jason signer: Xxxxx Xxxxxxxxx Interconnection Customer: CPV Rogue’s Wind, Timber Road Solar Park LLC EVP By:_ 12/6/2021 Executive Vice President, Eastern6/R1e8g/i2o0n21 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer: Xxxx Xxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate TransmissionAEP Ohio Transmission Company, LLC Dir FERC & RTO Support 12/16/2021 Inc. By:_ Vice President 7/2/2021 Name Title Date Printed name of signer:_Greg Xxxxxxxsigner:

Appears in 1 contract

Samples: Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE None SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AC2-086059/AD1-072/AD2-016) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects By:_ 12/16/2021 Projects8/25/2021 Name Title Date Printed name of signer:_Jason signer: Xxxxx Xxxxxxxxx Interconnection Customer: CPV Rogue’s WindYellowbud Solar, LLC EVP By:_ 12/6/2021 Vice President Transmission 7/29/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer: Xxxxx Xxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate TransmissionAEP Ohio Transmission Company, LLC Dir FERC & RTO Support 12/16/2021 Inc. By:_ Vice President 8/20/2021 Name Title Date Printed name of signer:_Greg Xxxxxxxsigner: Xxxxxx X. Xxxxxxx Customer shall be subject to the estimated charges detailed below, which shall be billed and paid in accordance with Appendix 2, Section 11 of this ISA and the applicable Interconnection Construction Service Agreement.

Appears in 1 contract

Samples: Service Agreement

AutoNDA by SimpleDocs

Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County SCHEDULE D SINGLE-LINE DIAGRAM IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AE2-086282) Transmission Provider: PJM Interconnection, L.L.C. Manager, Interconnection Projects By:_ 12/16/2021 7/13/2021 Name Title Date Printed name of signer:_Jason Xxxxxxxxx Interconnection Customer: CPV Rogue’s WindArche Energy Project, LLC EVP Vice President By:_ 12/6/2021 7/11/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer:_Eric Xxxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate TransmissionAmerican Transmission Systems, LLC Incorporated Dir FERC & RTO Support 12/16/2021 7/13/2021 By:_ Name Title Date Printed name of signer:_Greg signer:_Gregory X. Xxxxxxx

Appears in 1 contract

Samples: Original Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not Required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AD2-086093) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects Proje1c2t/s29/2021 Name Title Date Xxxxx Xxxxxxxxx Printed name of signer: Interconnection Customer: Cadence Solar Energy LLC By:_ 12/16/2021 Vice President 10/18/2021 Name Title Date Printed name of signer:_Jason Xxxxxxxxx Interconnection Customersigner: CPV Rogue’s WindXxxxxxx Xxxxxx Interconnected Transmission Owner: AEP Ohio Transmission Company, LLC EVP Inc. By:_ 12/6/2021 Vice President 12/21/2021 Name Title Date Printed name of signer:_Sean Xxxxxxxx Interconnected Transmission Ownersigner: Mid-Atlantic Interstate Transmission, LLC Dir FERC & RTO Support 12/16/2021 By:_ Name Title Date Printed name of signer:_Greg Xxxxxx X. Xxxxxxx

Appears in 1 contract

Samples: Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind solar generation facilities only) The wind solar generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) Irradiance • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: NOT APPLICABLE FOR THIS INTERIM ISA SCHEDULE C CUSTOMER FACILITY LOCATION/SITE PLAN 0000 Xx. Xxxxxxxx Xxxx Patton, Pennsylvania 16668 Grid Coordinates: 40.730186°, -78.683289° Clearfield County I INTERCONNECTION SPECIFICATIONS FOR AN ENERGY STORAGE RESOURCE Not Required SCHEDULE D SINGLE-LINE DIAGRAM J SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE Not Required SCHEDULE K REQUIREMENTS FOR INTERCONNECTION SERVICE BELOW FULL ELECTRICAL GENERATING CAPABILITY None IN WITNESS WHEREOF, Transmission Provider, Interconnection Customer and Interconnected Transmission Owner have caused this Interim ISA to be executed by their respective authorized officials. (PJM Queue Position #AF1AD1-086106) Transmission Provider: PJM Interconnection, L.L.C. By:_ Manager, Interconnection Projects By:_ 12/16/2021 Proje6c/t2s3/2022 Name Title Date Printed name of signer:_Jason signer: X_xxxx Xxxxxxxxx Interconnection Customer: CPV Rogue’s WindChestnut Solar, LLC EVP By:: _ 12/6/2021 Manager 5/24/2022 Name Title Date Printed name of signer:_Sean Xxxxxxxx signer: Xxxxx Xxxxxxxxxx Interconnected Transmission Owner: Mid-Atlantic Interstate TransmissionAEP Ohio Transmission Company, LLC Dir FERC & RTO Support 12/16/2021 Inc. By:: _ Vice President 6/20/2022 Name Title Date Printed name of signer:_Greg Xxxxxxxsigner: Xxxxxx X. Xxxxxxx SCHEDULE D APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDS 7/13/2022 7/13/2022 7/14/2022 Applicable Technical Requirements and Standards are set forth in the following documents that are posted on the PJM website: • “Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System,” Revision 3 dated June 30, 2021; • “Standards and Expectations for Siting, Real Estate, Right-of-Way, and Environmental Permitting for Transmission Interconnection Projects,” Version 2 dated August 20, 2020; and • “Independent Power Producer (IPP) Option to Build Guidelines,” Revision 3 dated October 28, 2021.

Appears in 1 contract

Samples: Service Agreement