Common use of Mechanic’s Liens Clause in Contracts

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 17 contracts

Samples: Industrial Lease (Sionix Corp /Ut/), Industrial Lease (Standard Pacific Corp /De/), Industrial Lease (Mai Systems Corp)

AutoNDA by SimpleDocs

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 9 contracts

Samples: Office Space Lease, Office Space Lease (Neothetics, Inc.), Office Space Lease (Neothetics, Inc.)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 8 contracts

Samples: Diedrich Coffee Inc, Office Space Lease (Netratings Inc), Assignment of Lease (Imperial Credit Commercial Holdings Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty ten (2010) days' business days prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility non-responsibility on the Premises.

Appears in 3 contracts

Samples: License Agreement (New Century Financial Corp), Lease (New Century Financial Corp), New Century Financial Corp

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense defend against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 3 contracts

Samples: Industrial Lease (Intralase Corp), Industrial Lease (Intralase Corp), Industrial Lease (Advanced Medical Optics Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 2 contracts

Samples: Industrial Lease (Sunpower Corp), Industrial Lease (GoRemote Internet Communications, Inc.)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by LandlordXxxxxxxx, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' days prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 2 contracts

Samples: Assignment of Lease (NBC Internet Inc), Xoom Inc

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it reasonably deems proper, including payment of or defense against the claim giving rise to the lien. All reasonable and actual expenses so incurred by Landlord, including Landlord's reasonable attorneys' fees, and any foreseeable consequential or other damages incurred by Landlord arising out of proximately caused by such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law Interest Rate provided for in Section 14.3(a) below until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 2 contracts

Samples: Lease (Broadcom Corp), Lease (Broadcom Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by notice from Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following such notice from Landlord of the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All reasonable expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following within ten (10) days of Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty ten (2010) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 2 contracts

Samples: Industrial Lease (Cryocor Inc), Industrial Lease (Cryocor Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty sixty (3060) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 2 contracts

Samples: Industrial Lease (Information Management Associates Inc), Industrial Lease (Naturade Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, . Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, . shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Impac Commercial Holdings Inc

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 8424 or any successor statute. In the event that Tenant shall not, within thirty ten (3010) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the lesser of 10% or maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' days prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility non- responsibility on the Premises.

Appears in 1 contract

Samples: Office Lease (Model N, Inc.)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense defuse against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other offer damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Oculex Pharmaceuticals Inc /)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s reasonable attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Peregrine Semiconductor Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien Lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Office Space Lease (United Panam Financial Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law Jaw until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Endwave Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) 15 days following its notification of the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) 20 days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Lease (Boot Barn Holdings, Inc.)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. paid Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility non-responsibility on the Premises.

Appears in 1 contract

Samples: Second Amendment to Lease (Alsius Corp)

AutoNDA by SimpleDocs

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, furnished or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' days prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Assignment of Lease (Viador Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Tenant Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Sensar Corp /Nv/)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises. SECTION 7.5.

Appears in 1 contract

Samples: Industrial Lease (Ambassadors International Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems properreasonable means, including payment of or defense against the claim giving rise to the lien. All reasonable and actual expenses so incurred by Landlord, including Landlord's ’s reasonable attorneys' fees, and any foreseeable consequential or other damages incurred proximately caused by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law Interest Rate set forth in Section 14.3 below until paid. Tenant shall give Landlord no less than twenty ten (2010) days' prior notice in writing before commencing construction of any kind on the Premises (except for the Tenant Improvements) so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Lease Agreement (Palm Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All reasonable and actual expenses so incurred by Landlord, including Landlord's attorneys' reasonable attorney's fees, and any foreseeable consequential or other damages incurred by Landlord arising out of proximately caused by such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Omm Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's ’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. paid Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility non-responsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Ithaka Acquisition Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by LandlordXxxxxxxx, including Landlord's ’s attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's Xxxxxxxx’s demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Utilities and Services (Sirf Technology Holdings Inc)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' attorney's fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Newgen Results Corp)

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' day's prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Vision Solutions Inc

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law of ten percent (10%) per annum until paid. Tenant shall give Landlord no less than twenty ten (2010) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Pimco Advisors Holdings Lp

Mechanic’s Liens. Tenant shall keep the Premises free from any liens arising out of any work performed, materials furnished, or obligations incurred by or for Tenant. Upon request by Landlord, Tenant shall promptly cause any such lien to be released by posting a bond in accordance with California Civil Code Section 3143 or any successor statute. In the event that Tenant shall not, within thirty (30) days following the imposition of any lien, cause the lien to be released of record by payment or posting of or a proper bond, Landlord shall have, in addition to all other available remedies, the right to cause the lien to be released by any means it deems proper, including payment of or defense against the claim giving rise to the lien. All expenses so incurred by Landlord, including Landlord's attorneys' fees, and any consequential or other damages incurred by Landlord arising out of such lien, shall be reimbursed by Tenant promptly following Landlord's demand, together with interest from the date of payment by Landlord at the maximum rate permitted by law until paid. Tenant shall give Landlord no less than twenty (20) days' prior notice in writing before commencing construction of any kind on the Premises so that Landlord may post and maintain notices of nonresponsibility on the Premises.

Appears in 1 contract

Samples: Industrial Lease (Silicon Storage Technology Inc)

Time is Money Join Law Insider Premium to draft better contracts faster.