Manuals and Drawings Sample Clauses

Manuals and Drawings. 1. Before the goods and services are taken over by the user, the Vendor shall supply operation and maintenance manuals, (together with drawings of the goods and services where applicable).
AutoNDA by SimpleDocs
Manuals and Drawings. Owner shall provide Operator with all operation and maintenance manuals and all drawings, specifications, diagrams, and other information which Owner has or may obtain with respect to the Facility including any of the same that Contractor is obligated to provide to Owner pursuant to the Construction Contract. Should any such information be classified as confidential or proprietary, then Owner shall use reasonable efforts to obtain all necessary authorizations, releases, acknowledgments, or other approvals to provide Operator access to and use of such information. Operator, in turn, shall comply with all resulting requirements for protecting the confidential or proprietary nature of such information, including without limitation, any such requirements contained in any Project Agreement following receipt of such requirements.
Manuals and Drawings. Owner shall deliver to Operator copies of any and all Facility operating and maintenance manuals, and any drawings record books and vendor manuals, in the possession of Owner, other than any such manuals, drawings or record books that have been provided by Operator or by the EPC Contractor through Operator.
Manuals and Drawings. The following shall be provided at time of delivery. The information shall be organized in a three ring binder format with each section clearly identified. A draft copy must be available for review and acceptance prior to preproduction meeting.
Manuals and Drawings. TransCore shall provide revised, fully updated versions of all maintenance manuals, current Maintenance Plan, installation drawings, as-built drawings, and other relevant documentation to the satisfaction of FBGPTRA.
Manuals and Drawings. 12.6 Before the Goods and Services are taken over by the Employer, the Contractor shall supply operation and maintenance manuals together with drawings of the goods and equipment. These shall be in such detail as will enable the Employer to operate, maintain, adjust and repair all parts of the equipment as stated in the specifications.
Manuals and Drawings. 7.5.1 Before the goods and equipment are taken over by the Bank, the Supplier shall supply operation and maintenance manuals together with drawings, wherever applicable, of the goods. The manuals and drawings shall be in English.
AutoNDA by SimpleDocs
Manuals and Drawings. Owner shall provide Operator with all current Operating Manuals and with all as built drawings, specifications, warranties, diagrams, test results and other documents and information which Owner may have with respect to the RDF Facilities, which is necessary to Operator's provision of the Contract Services. Should any such information be classified as confidential or proprietary, Owner shall seek to obtain all necessary authorizations, releases, acknowledgments or other approvals necessary to provide Operator access to and use of such information. Operator shall comply with all reasonable requests to protect the confidential and proprietary nature of such information, including, but not limited to, any requirements contained in any RDF Facility Agreement.

Related to Manuals and Drawings

  • Drawings a. Drawings Submitted With Bid When the Bid Specifications require the Bidder to furnish drawings and/or plans, such drawings and/or plans shall conform to the mandates of the Bid

  • L/C Applications The Company shall execute and deliver to the Issuing Lender the Master Letter of Credit Agreement from time to time in effect. The Company shall give notice to the Administrative Agent and the Issuing Lender of the proposed issuance of each Letter of Credit on a Business Day which is at least three Business Days (or such lesser number of days as the Administrative Agent and the Issuing Lender shall agree in any particular instance in their sole discretion) prior to the proposed date of issuance of such Letter of Credit. Each such notice shall be accompanied by an L/C Application, duly executed by the Company and in all respects satisfactory to the Administrative Agent and the Issuing Lender, together with such other documentation as the Administrative Agent or the Issuing Lender may request in support thereof, it being understood that each L/C Application shall specify, among other things, the date on which the proposed Letter of Credit is to be issued, the expiration date of such Letter of Credit (which shall not be later than the scheduled Termination Date (unless such Letter of Credit is Cash Collateralized)) and whether such Letter of Credit is to be transferable in whole or in part. Any Letter of Credit outstanding after the scheduled Termination Date which is Cash Collateralized for the benefit of the Issuing Lender shall be the sole responsibility of the Issuing Lender. So long as the Issuing Lender has not received written notice that the conditions precedent set forth in Section 12 with respect to the issuance of such Letter of Credit have not been satisfied, the Issuing Lender shall issue such Letter of Credit on the requested issuance date. The Issuing Lender shall promptly advise the Administrative Agent of the issuance of each Letter of Credit and of any amendment thereto, extension thereof or event or circumstance changing the amount available for drawing thereunder. In the event of any inconsistency between the terms of the Master Letter of Credit Agreement, any L/C Application and the terms of this Agreement, the terms of this Agreement shall control.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Selection of Architect/Construction Drawings Tenant shall retain the architect/space planner designated by Tenant and reasonably approved by Landlord (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.2. Tenant shall retain the engineering consultants selected by Tenant (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, life safety, and sprinkler work in the Premises, which work is not part of the Base Building. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the base building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant’s waiver and indemnity set forth in the Lease shall specifically apply to the Construction Drawings.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • No Reverse Engineering You may not, and you agree not to or enable others to, copy (except as expressly permitted by this License or by the Usage Rules if they are applicable to you), decompile, reverse engineer, disassemble, attempt to derive the source code of, decrypt, modify, or create derivative works of the Apple Software or any services provided by the Apple Software, or any part thereof (except as and only to the extent any foregoing restriction is prohibited by applicable law or to the extent as may be permitted by the licensing terms governing use of open-sourced components included with the Apple Software).

  • Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. The term "Specifications" shall also include all written matter in the Project Manual or on the drawings and any Addenda or Change Orders thereto.

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Title 24 calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow all of Tenant’s Agents to bid on the work and to obtain all applicable permits (collectively, the ‘‘Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned, or delayed. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings, Landlord shall not unreasonably withhold, condition, or delay its approval of the Final Working Drawings. Landlord shall approve or reasonably EXHIBIT A disapprove of the Final Working Drawings within ten (10) business days after Landlord’s receipt thereof. If Landlord reasonably withholds its approval, Landlord shall provide Tenant with the specific reasons therefor.

  • Manuals Each product delivered under contract to any Customer must be delivered with at least one (1) copy of a safety and operating manual and any other technical or maintenance manual. The cost of the manual(s) must be included in the price for the Product offered.