Major Repair Sample Clauses

Major Repair. Actions to be taken for ‘Major Repair’ are as detailed for Minor Repair, however the requirement will be driven by the general condition of the Article, and the increased cost and scale of replacing the missing or defective parts. Where the Contractor defines an Article within this category the details of timescales for completion of repair are to be forwarded to the Authority in accordance with Para. 3.2.1.
AutoNDA by SimpleDocs
Major Repair. Major repair of tidegates and floodgates that discharge to natural watercourses are covered under this agreement. Major repair actions include all maintenance activities, not categorized as minor repair, required to keep the tidegates and floodgates operational. These actions include, but are not limited to: the replacement of doors and collars; replacement and installation of liners; repair of discharge pipes and tubes; repair of rock armoring or thresholds; and, in rare instances, debris removal requiring the access of heavy equipment within the watercourse. Major repairs shall not include actions that require excavation of the dike or levee to accomplish the repair. Replacement of doors may require the use of heavy equipment, such as a boom truck or excavator, depending on the type of door, size and material. Any heavy equipment used is staged and operated from the dike or bridge. The door is suspended over the dike, near the tube opening, and is manually connected to the collar. Work is conducted during a low tide cycle and no cofferdam is required. Replacement of collars is rarely necessary, but in instances when a collar requires replacement, the work is performed manually during a low tide cycle and no cofferdam is required. Lining of a tube consists of installing a liner to the inside section of the tube where corrosion typically occurs. To line an existing tube with new material, the work must be conducted during a low tide cycle when the tube can be easily accessed. Any debris in the existing tube is removed so that the liner will fit properly. The new lining material is installed within the existing tube by utilizing a boom truck or other equipment that can lift and suspend the new liner over the watercourse near that tube opening. The equipment is staged from the dike (or bridge) and does not enter below the OHW or MHW elevation. Once the liner is in position it is manually placed in alignment with the tube and then secured to the existing tube. The new liner is grouted into place to provide a seal between the tube and the liner. Discharge pipe or tube repair consists of patching holes or cracks in the protruding ends on either side of the dike. The damaged area is patched with cement or fiberglass, depending on the composition of the pipe or tube. Patches are typically used to repair small holes or cracks. If the damaged area is large enough that a patch will not work the protruding end of the pipe will be encased in cement. These are typicall...

Related to Major Repair

  • Repair or Replacement (1) Unless a dispute resolution process has been initiated, the Insurer, instead of making payment, may repair, rebuild, or replace the insured property lost or damaged, on giving written notice of its intention to do so within thirty days after receiving the proof of loss.

  • Repair Concessionaire shall, prior to the commencement of the Concession Operation under the Agreement, provide to Department a type-written concession equipment maintenance plan for the State-owned equipment located on the Concession Premises, together with a schedule for preventative maintenance and a report on maintenance completion and equipment condition. Failure to comply with this preventative maintenance schedule shall result in Concessionaire being responsible for all repairs and/or replacement of equipment. The review and Department inspection of the Concession Premises and its equipment will be conducted during routine inspection of the Concession Premises and as a part of the Mandatory Compliance and Performance Evaluation Meetings.

  • MAINTENANCE & REPAIR Tenant agrees that if there is any delay in maintenance or repairs for reasons beyond Landlord's control, this shall have no effect on Tenant's obligations under this lease.

  • MAINTENANCE, REPAIRS, OR ALTERATIONS The Tenant shall, at their own expense and at all times, maintain premises in a clean and sanitary manner, and shall surrender the same at termination hereof, in as good condition as received, normal wear and tear excepted. The Tenant may not make any alterations to the leased premises without the consent in writing of the Landlord. The Landlord shall be responsible for repairs to the interior and exterior of the building. If the Premises includes a washer, dryer, freezer, dehumidifier unit and/or air conditioning unit, the Landlord makes no warranty as to the repair or replacement of units if one or all shall fail to operate. The Landlord will place fresh batteries in all battery-operated smoke detectors when the Tenant moves into the premises. After the initial placement of the fresh batteries it is the responsibility of the Tenant to replace batteries when needed. A monthly "cursory" inspection may be required for all fire extinguishers to make sure they are fully charged.

  • Maintenance & Repairs 5.1 Lessee shall at all times be responsible for maintaining at its own expense the leased premises in a clean, orderly and safety condition, except as hereinafter provided. Lessee shall be responsible, at its own expense, to clean and maintain all trade fixtures, machinery and equipment furnished by Lessee within the leased premises. Lessee shall be responsible to deposit normal office waste and rubbish at a location at the Central School as designated by Lessor.

  • Maintenance, Repairs and Alterations Landlord hereby covenants that the Premises shall be in reasonably good and usable condition as of the effective date of this Agreement. Replacements made by Landlord, if any, shall belong to it. Landlord shall keep access to the Premises free and clear of any and all obstructions including snow and ice. ** Portions of this agreement have been omitted and filed separately with the SEC pursuant to a confidential treatment request CONFIDENTIAL EXECUTION VERSION In the event of an emergency, Tenant shall have the right to perform any obligation of Landlord under this Agreement and recover from Landlord any reasonable amounts so expended by Tenant within thirty (30) days of the date of demand or, in the alternative, to offset amounts so expended against Rent. Landlord shall, at its sole expense, make structural repairs and replacements to the footings, foundation and structural elements of walls and roofs of the Premises and also shall be responsible for maintenance, repairs and replacements, at its sole expense, of heating, ventilating, air conditioning systems, plumbing systems, and electrical systems, provided, however, that Tenant, at its sole expense, shall be responsible for maintenance, repairs and replacements regarding the irrigation system on the Premises as well as Tenant's occupancy costs as described above in Section 4 of this Agreement and shall also be responsible for maintenance, repairs or replacements necessitated by Tenant's actions. Contact information for the Landlord in case of any maintenance, repair or replacement issues is as follows: [**]1 Additions, improvements and alterations made by Tenant, whether temporary or permanent in nature, shall be subject to the prior approval of Landlord and upon completion shall belong to Tenant, provided that removal may be made without damage to the Premises at the expiration of the Agreement term. If removal of the improvements or alterations would cause damage to the Premises, said improvements and alterations shall automatically become the property of Landlord. Tenant, at its sole expense, shall be responsible for maintenance, repairs and replacements of any additions, improvements or alterations made by Tenant on, in or to the Premises. Tenant shall keep the Premises in good order, repair and condition at all times during the Agreement term, except for ordinary wear and tear.

  • Emergency Repairs a) The landlord must post and maintain in a conspicuous place on the residential property, or give to the tenant in writing, the name and telephone number of the designated contact person for emergency repairs.

  • Punchlist Upon completion of the Performance Tests and prior to Substantial Completion of a Subproject, Owner and Contractor shall inspect the Subproject, and Contractor shall prepare a proposed Punchlist of items identified as needing to be completed or corrected as a result of such inspection. Contractor shall promptly provide the proposed Punchlist to Owner for its review, together with an estimate of the time and cost necessary to complete or correct each Punchlist item. Contractor shall add to the proposed Punchlist any Punchlist items that are identified by Owner within ten (10) Days after Owner’s receipt of the proposed Punchlist from Contractor, and Contractor shall immediately initiate measures to complete or correct, as appropriate, any item on Contractor’s proposed Punchlist (including those items identified by Owner during Owner’s review) that are not of a Punchlist nature. Notwithstanding anything to the contrary in this Agreement, Contractor and Owner are not required as a condition of Substantial Completion of a Subproject to agree upon and identify every Punchlist item and include it on the Punchlist, but Contractor is required to complete as a condition of Substantial Completion of such Subproject that does not meet the definition of Punchlist as provided in Section 1.1. In the event of a dispute regarding whether a specific item of Work meets the definition of Punchlist under Section 1.1, the Parties shall resolve such dispute in accordance with Section 18.1A. Owner shall provide Contractor with access to the Work after Substantial Completion of a Subproject sufficient to enable Contractor to complete all Punchlist items, so long as such access does not unreasonably interfere with operation of a Subproject after Substantial Completion of the Subproject or the Existing Facility and subject to any reasonable security or safety requirements of Owner. Upon Contractor’s completion or correction of any items necessary to achieve Substantial Completion of a Subproject, as modified by any Owner additions, such Punchlist shall govern Contractor’s performance of the Punchlist items up to Final Completion. All Work on the Punchlist shall be completed by the date required for Final Completion, as specified in Section 5.3C, or Owner may, in addition to any other rights that it may have under this Agreement, complete such Punchlist Work at the expense of Contractor. In the event Owner elects to complete such Punchlist Work, Contractor shall pay Owner, within ten (10) Days after receipt of written notice from Owner, all reasonable costs and expenses incurred by Owner in performing such Punchlist Work, or, at Owner’s sole discretion, Owner may withhold or offset amounts owed to Contractor or collect on the Letter of Credit in accordance with Section 7.8 in the amount of such costs and expenses. Any Defective Work identified after agreement between the Parties of the Punchlist shall be corrected by Contractor as a Warranty item under Article 12.

  • Repairs Tenant shall, at Tenant’s own expense, keep the Premises, including all improvements, fixtures, furnishings, and systems and equipment to the extent located therein (including plumbing fixtures and equipment such as dishwashers, garbage disposals, refrigerators, coffee makers and Insta Hot and similar dispensers), and the portion of the floor or floors of the Building on which the Premises are located, in good order, repair and condition at all times during the Lease Term. In addition, Tenant shall, at Tenant’s own expense, but under the supervision and subject to the prior approval of Landlord, and within any reasonable period of time specified by Landlord, promptly and adequately repair all damage to the Premises and replace or repair all damaged, broken, or worn fixtures and appurtenances, except for damage caused by ordinary wear and tear or beyond the reasonable control of Tenant; provided however, that, at Landlord’s option, or if Tenant fails to make such repairs, Landlord may, but need not, make such repairs and replacements, and Tenant shall pay Landlord the cost thereof, including a fifteen percent (15%) supervisory fee forthwith upon being billed therefor. Notwithstanding the foregoing, Landlord shall be responsible for repairs to the exterior walls, foundation and roof of the Building, the structural portions of the floors of the Building, and the base building systems and equipment of the Building, except to the extent that such repairs are required due to the negligence or willful misconduct of Tenant; provided, however, that if such repairs are due to the negligence or willful misconduct of Tenant, Landlord shall nevertheless make such repairs at Tenant’s expense, or, if covered by Landlord’s insurance, Tenant shall only be obligated to pay any deductible in connection therewith. Landlord may, but shall not be required to, enter the Premises at all reasonable times to make such repairs, alterations, improvements or additions to the Premises or to the Project or to any equipment located in the Project as Landlord shall desire or deem necessary or as Landlord may be required to do by governmental or quasi-governmental authority or court order or decree. Tenant hereby waives any and all rights under and benefits of subsection 1 of Section 1932 and Sections 1941 and 1942 of the California Civil Code or under any similar law, statute, or ordinance now or hereafter in effect.

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

Time is Money Join Law Insider Premium to draft better contracts faster.