Common use of Maintenance Programme Clause in Contracts

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 37 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

AutoNDA by SimpleDocs

Maintenance Programme. 17.4.1 16.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerEngineer(s), its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 6 contracts

Samples: Concession Agreement, Draft Concession Agreement, Draft Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 5 contracts

Samples: Concession Agreement, Model Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 18.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority MOR and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 4 contracts

Samples: Model Agreement, Model Agreement, Model Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Concessioning Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 4 contracts

Samples: Draft Concession Agreement, Draft Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority MOR and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Model Agreement, Model Agreement, Model Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty 45(forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of condition-based, preventive, urgent and other scheduled maintenance (the "Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual Manual, Safety Requirements and Safety RequirementsGood Industry Practice. Such Maintenance Programme shall includeinclude :

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety RequirementsRequirements as per Specifications and Standards. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Model Concession Agreement, Model Concession Agreement, Model Concession Agreement

Maintenance Programme. 17.4.1 17.4.1. On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerExpert, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Draft Concession Agreement, Draft Concession Agreement, Draft Concession Agreement

Maintenance Programme. 17.4.1 On or before Final COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerExpert, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. , Such Maintenance Programme shall include:;

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority MPRDC and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority Government and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no 16.4.1 Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerMonitor[s], its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Service Requirements, Service Quality Manual, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 16.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire Mine Operator shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 2 contracts

Samples: Model Contract Agreement, coal.nic.in

Maintenance Programme. 17.4.1 On or before COD and no Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 18.4.1 On or before COD and no not later than 45 forty five (forty five45) days prior to before the beginning of each Accounting Year during the Operation Period, as the case may beYear, the Concessionaire Concessionaire, shall provide to the Authority and the Independent EngineerAuthority, its proposed annual programme Programme of preventive, urgent preventive and other scheduled maintenance of the Project subject to the minimum Maintenance Requirements set forth in Maintenance Manual and in Schedule ‘L’ necessary to maintain the Project at all times in conformity with the Specifications and Standards (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements). Such Maintenance Programme shall includeinclude but not be limited to the following:

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 2 contracts

Samples: Iii Concession Agreement, Concession Agreement

Maintenance Programme. 17.4.1 On or before COD the Appointed Date and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority GOTN, HD and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty forty-five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Concessioning Authority and the Independent Engineer, its proposed annual programme of preventive, urgent preventive and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements). Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 15.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority Government and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the " Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 16.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerEngineer(s), its proposed annual programme program of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Draft Concession Agreement

Maintenance Programme. 17.4.1 16.4.1 On or before COD and no later than 45 (forty forty-five) later than days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerEngineer(s), its proposed annual programme program of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme Program shall include:

Appears in 1 contract

Samples: Draft Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerConcessioning Authority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no Not later than 45 (forty forty-five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerExpert, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Service Requirements, Service Quality Manual, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: niti.gov.in

AutoNDA by SimpleDocs

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority MOPIT and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 17.5.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Operation & Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire Operator shall provide to the Authority and the Independent EngineerNodal Officer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Substitution Agreement

Maintenance Programme. 17.4.1 On or before COD and no Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerAuthority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) in respect of the MLCP and its components to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Escrow Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerNodal Officer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Draft Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerExpert, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: fci.gov.in

Maintenance Programme. 17.4.1 16.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire Mine Operator shall provide to the Authority and the Independent EngineerEngineer in charge, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: www.cmpdi.co.in

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of condition-based, preventive, urgent and other scheduled maintenance (the "Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual Manual, Safety Requirements and Safety RequirementsGood Industry Practice. Such Maintenance Programme shall includeinclude :

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 15.4.1 On or before COD and no later than 45 (forty five) later than days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Authority Government and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerAuthority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:Requirements.and in accordance with Schedule 4 .

Appears in 1 contract

Samples: Section 2

Maintenance Programme. 17.4.1 16.4.1 On or before the COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire Mine Operator shall provide to the Authority and the Independent EngineerandEngineer in charge, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Contract Agreement

Maintenance Programme. 17.4.1 17.4.1. On or before COD for each Phase and no later than 45 (forty forty-five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 14.4.1. On or before COD Appointed Date {O&M Handover Date45} and no later than 45 (forty five) five)46 days prior to the beginning of each Accounting Year during the Operation Concession Period, as the case may be, the Concessionaire shall provide to the Contracting Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the "Maintenance Programme") to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no 10.4.1 Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerConcessioning Authority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no 15.4.1 Not later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerAuthority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, and Maintenance Manual and Safety RequirementsManual. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Concession Agreement

Maintenance Programme. 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent EngineerAuthority, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Appears in 1 contract

Samples: Section 2