Maintenance Levels Sample Clauses

Maintenance Levels. A. Attainment of the varying levels is based on the standards contained in Appendix B when the supervisor and the department head verify in writing that the requirements in Appendix B have been met and HR has verified eligibility including, if appropriate, the credentials.
AutoNDA by SimpleDocs
Maintenance Levels. ‌ Acceptable maintenance levels are defined by the criticality of the equipment. The following is a generic description of each level.
Maintenance Levels. 1. The A-VDGS system shall be maintained at several levels utilizing the on-site IAA's technical team. The IAA's technical team shall be trained and certified to perform the basic and some advanced maintenance levels and the Supplier shall complete and support all maintenance levels according to its maintenance doctrine and without degrading its full responsibility for the A-VDGS system availability. (P)
Maintenance Levels. 13.1 As set out within the Customer Agreement and the Avoira Service LevelsNetwork Services. A-LC-7 V2 ST Last edited: Feb 2022 Public

Related to Maintenance Levels

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Maintenance Outages If Seller reasonably determines that it is necessary to schedule a Maintenance Outage, Seller shall notify Buyer of the proposed Maintenance Outage at least five (5) days before the outage begins (or such shorter period to which Buyer may reasonably consent in light of then existing conditions). Upon such notice, the Parties shall plan the Maintenance Outage to mutually accommodate the reasonable requirements of Seller and the service obligations of Buyer; provided, however, that, unless Buyer otherwise consents, such consent not to be unreasonably withheld, no Maintenance Outage may be scheduled between the hour ending 0700 through the hour ending 2200, Monday through Saturday, during the time period commencing on May 15 and concluding on September 15. Notice of a proposed Maintenance Outage shall include the expected start date and time of the outage, the amount of Capacity of the Facility that will not be available, and the expected completion date and time of the outage. Seller shall give Buyer notice of the Maintenance Outage as soon as Seller determines that the Maintenance Outage is necessary. Buyer shall promptly respond to such notice and may request reasonable modifications in the schedule for the outage. Seller shall use all reasonable efforts to comply with any request to modify the schedule for a Maintenance Outage. Seller shall notify Buyer of any subsequent changes in Capacity available to Buyer or any changes in the Maintenance Outage completion date and time. As soon as practicable, any notifications given orally shall be confirmed in writing. Seller shall take all reasonable measures and exercise its best efforts in accordance with Prudent Electrical Practices to minimize the frequency and duration of Maintenance Outages.

  • Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

  • Maintenance Standards Unless otherwise authorized by the CRC Board, the General Manager shall prepare and submit to the CRC Board proposals (including the Program Maintenance plan submitted pursuant to Section 5(b)) for the performance of such Routine Maintenance and Program Maintenance as is reasonably necessary to keep and maintain the Shared Assets substantially in their condition as of the date of this Agreement. If the CRC Board fails either to approve or disapprove by majority vote any such proposal within 45 days after it was submitted to the CRC Board, the disagreement over the propriety or need for any of the Routine Maintenance or Program Maintenance included in such proposal may be submitted by either Operator for resolution by binding arbitration pursuant to Section 13.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • MAINTENANCE WORK Landlord reserves the right from time to time, but subject to payment by and/or reimbursement from Tenant as otherwise provided herein: (i) to install, use, maintain, repair, replace, relocate and control for service to the Premises and/or other parts of the Project pipes, ducts, conduits, wires, cabling, appurtenant fixtures, equipment spaces and mechanical systems, wherever located in the Premises or the Project, (ii) to alter, close or relocate any facility in the Premises or the common areas or otherwise conduct any of the above activities for the purpose of complying with a general plan for fire/life safety for the Project or otherwise, and (iii) to comply with any federal, state or local law, rule or order. Landlord shall attempt to perform any such work with the least inconvenience to Tenant as is reasonably practicable, but in no event shall Tenant be permitted to withhold or reduce Basic Rental or other charges due hereunder as a result of same, make any claim for constructive eviction or otherwise make any claim against Landlord for interruption or interference with Tenant's business and/or operations.

  • Maintenance Support State Street shall use commercially reasonable efforts to correct system functions that do not work according to the System Product Description as set forth on Attachment A in priority order in the next scheduled delivery release or otherwise as soon as is practicable.

  • Maintenance Programme 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

  • Service Levels Annex 1 to this Part A of this Call Off Schedule sets out the Service Levels the performance of which the Parties have agreed to measure. The Supplier shall monitor its performance of this Call Off Contract by reference to the relevant performance criteria for achieving the Service Levels shown in Annex 1 to this Part A of this Call Off Schedule (the Service Level Performance Criteria) and shall send the Customer a Performance Monitoring Report detailing the level of service which was achieved in accordance with the provisions of Part B (Performance Monitoring) of this Call Off Schedule. The Supplier shall, at all times, provide the Services in such a manner that the Service Levels Performance Measures are achieved. If the level of performance of the Supplier of any element of the provision by it of the Services during the Call Off Contract Period: is likely to or fails to meet any Service Level Performance Measure or is likely to cause or causes a Critical Service Failure to occur, the Supplier shall immediately notify the Customer in writing and the Customer, in its absolute discretion and without prejudice to any other of its rights howsoever arising including under Clause 12 of this Call Off Contract (Service Levels and Service Credits), may: require the Supplier to immediately take all remedial action that is reasonable to mitigate the impact on the Customer and to rectify or prevent a Service Level Failure or Critical Service Level Failure from taking place or recurring; and if the action taken under paragraph (a) above has not already prevented or remedied the Service Level Failure or Critical Service Level Failure, the Customer shall be entitled to instruct the Supplier to comply with the Rectification Plan Process; or if a Service Level Failure has occurred, deduct from the Call Off Contract Charges the applicable Service Level Credits payable by the Supplier to the Customer in accordance with the calculation formula set out in Annex 1 of this Part A of this Call Off Schedule; or if a Critical Service Level Failure has occurred, exercise its right to Compensation for Critical Service Level Failure in accordance with Clause 13 of this Call Off Contract (Critical Service Level Failure) (including subject, for the avoidance of doubt, the proviso in Clause 13.1.2 of this Call Off Contract in relation to Material Breach). Approval and implementation by the Customer of any Rectification Plan shall not relieve the Supplier of any continuing responsibility to achieve the Service Levels, or remedy any failure to do so, and no estoppels or waiver shall arise from any such Approval and/or implementation by the Customer. SERVICE CREDITS Annex 1 to this Part A of this Call Off Schedule sets out the formula used to calculate a Service Credit payable to the Customer as a result of a Service Level Failure in a given service period which, for the purpose of this Call Off Schedule, shall be a recurrent period of [one Month] during the Call Off Contract Period (the Service Period).