Main Lobby Sample Clauses

Main Lobby. Post 1 Security Personnel will be stationed in the main lobby of 0000 Xxxx 0xx Xxxxxx, Xxxxxx, Xxxxx, 7:30 a.m. to 5:30 p.m. Monday through Friday. On Saturdays and Sundays conduct internal and external control of property, monitor security systems, and issue parking violations as needed.
AutoNDA by SimpleDocs
Main Lobby a. Clean walls with damp cloth and dust weekly. MONTHLY
Main Lobby. Daily: o Empty lobby trash receptacles as needed, but not less than four times per day. o Periodically clean lobby glass and entrance glass of fingerprints and smudges. o Carpet sweep walk-off mats as needed. o Spot clean chrome and bright work as needed. o Place and / or pick up walk-off mats as weather conditions require. Shampoo as required. Nightly: o Wet mop all flooring paying special attention to corners, edges, and baseboard. Remove all scuffs and stains. o Wipe clean and dust all visitor reception areas, including removal of any trash. Clean and sanitize all telephones. o Dust and clean lobby directory. o Dust and clean all walls from floor to 72" above floor. o Clean and polish all metal doors and bucks, handrails, revolving doors and drums of revolving doors, interior and exterior. o Wipe clean and polish all planters. o Wipe down and clean the security desk area and equipment. o Remove all finger marks, dirt smudges, graffiti, etc., from all revolving doors, frames, glass doors, partitions, windows, walls, elevator doors and elevator jambs. o Empty (clean and sanitize as needed) all waste receptacles. Remove wastepaper and waste materials to designated area. o Remove gum from walk-off mats and all other types of flooring. o Vacuum all walk-off mats. o Vacuum, clean and polish all floor saddles. o Clean and sanitize all public telephones and surrounding area. o Dust all flat surfaces including furniture. o Place and / or pick up walk-off mats as weather conditions require. Weekly: o Dust all low reach areas including, but not limited to, chair rungs, structural and furniture ledges, baseboards, window xxxxx, door louvers, moldings, etc. o Dust all fire extinguishers cabinets or enclosures, enunciator panels and pull stations. o Sweep, mop and spray buff all hard flooring. Ensure a consistent finish around edges and base. o Wash and disinfect all waste receptacles.
Main Lobby. Daily: • Empty lobby trash receptacles as needed, but not less than four times per day. • Periodically clean lobby glass and entrance glass of fingerprints and smudges. • Carpet sweep walk-off mats as needed. • Spot clean chrome and bright work as needed. • Place and / or pick up walk-off mats as weather conditions require. Shampoo as required.
Main Lobby. 1. Dust mop all floor areas once per day or more if needed, spot clean with a clean damp mop.
Main Lobby. A.Daily • Vacuum elevator cabs. • Clean and polish elevator cabs and the inside and outside of elevator doors. • Clean ashtrays inside and out. • Clean and polish entry glass, door frames and handles inside and out. • Damp mop hard surface flooring. • Dust security post and directory if applicable.
Main Lobby. 1. Sweep lobby floor, clean spills and stains. Damp mop floor as necessary.
AutoNDA by SimpleDocs
Main Lobby. Accessible via stone-clad monumental entry stairs at the grand portal xxx Xxxxxx Xxxxxx to the east and at the large, raised landscaped plaza off Xxxxxxxx Xxxxxx to the west, the building’s main lobby is a two-story glass cube with elegant stone flooring, landscaping, monumental artwork and a security desk providing visitor information and controlling access to the core elevators.
Main Lobby. Floors: Granite, marble or other natural stone with carpet inserts at elevator lobbies. Walls: Feature walls will be some combination of stone, back-painted glass, drywall, wood panels accented with stone and/or stainless steel and painted veneer plaster with reveals. Stone or metal base. Ceilings: Painted veneer plaster on gypsum board with acoustic panel accents. Elevator Frames and Doors: Stainless steel Base building architect will collaborate with Xxxxxx’s architect to ensure the lobby meets Xxxxxx’s design objectives within reason and consistent with Class A office buildings in the Boston, MA and Cambridge, MA submarket.
Main Lobby. NONE POLYMER PROCESSING
Time is Money Join Law Insider Premium to draft better contracts faster.