Longer Sessions Sample Clauses

Longer Sessions. If the negotiation session is scheduled for, and actually lasts six hours or more, regardless of start time, the negotiators will be released for the entire day. However, if their absence places an undue hardship on the department, the employee may be required to complete their shift and be paid overtime.
AutoNDA by SimpleDocs

Related to Longer Sessions

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Directory Listings 15.1.1 CBT, as publisher of its White Pages, will include Primary Listings of CLEC’s resale directory customers in its White Pages, and shall cause its publisher to include primary listings of CLEC’s directory customers in its Publisher’s Yellow Pages Directories under the following terms and conditions:

  • Workplace Bullying Bullying for the purpose of this Article is any repeated or systemic behaviour which may be either physical, verbal or psychological including shunning, which would be seen by a reasonable person as intending to belittle, intimidate, coerce or isolate another person. Personal harassment and/or bullying does not include acceptable social banter in the workplace. Nor does it include actions occasioned through the exercise in good faith of management’s rights for bona fide operational requirements or progressive corrective discipline in a manner that is respectful of those involved.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Tuberculosis Examination The examination shall consist of an approved intradermal tuberculosis test, which, if positive, shall be followed by an X-ray of the lungs. Nothing in Sections 5163 to 5163.2, inclusive, shall prevent the governing body of any city or county, upon recommendation of the local health officer, from establishing a rule requiring a more extensive or more frequent examination than required by Section 5163 and this section. § 5163.2. Technician taking X-ray film; Interpretation of X-ray The X-ray film may be taken by a competent and qualified X-ray technician if the X-ray film is subsequently interpreted by a licensed physician and surgeon.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.