  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • DISQUALIFICATION FOR PAST PERFORMANCE AND FINDINGS OF NON RESPONSIBILITY Bidder may be disqualified from receiving awards if Bidder, or anyone in Bidder’s employment, has previously failed to perform satisfactorily in connection with public Bidding or contracts or is deemed non- responsible.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Benefit Level Two Health Care Network Determination Issues regarding the health care networks for the 2017 insurance year shall be negotiated in accordance with the following procedures:

  • Provision for Generation Compensation Grid unavailability in a contract year as defined in the PPA: (only period from 8 am to 6 pm to be counted): Generation Loss = [(Average Generation per hour during the Contract Year) × (number of hours of grid unavailability during the Contract Year)] Where, Average Generation per hour during the Contract Year (kWh) = Total generation in the Contract Year (kWh) ÷ Total hours of generation in the Contract Year. The excess generation by the SPD equal to this generation loss shall be procured by the Buying Utility at the PSA tariff so as to offset this loss in the succeeding 3 (three) Contract Years.

  • Hospital-Association Committee (a) There shall be a Hospital-Association Committee comprised of representatives of the Hospital, one of whom shall be the Chief Nursing Officer or designate and of the Association, one of whom shall be the Bargaining Unit President or designate. The number of representatives is set out in the Appendix of Local Provisions and the membership of the Committee may be expanded by mutual agreement.

  • Employment Categories (a) Employees under this Agreement will be employed in one of the following categories:

  • Training Designation Type Code Select and insert the appropriate training credit designation type code: Code Short Description Long Description (If Applicable) 01 Undergraduate Credit N/A 02 Graduate Credit N/A 03 Continuing Education Unit N/A 04 Post Graduate Credit N/A 05 N/A N/A

  • SALARY DETERMINATION FOR EMPLOYEES IN ADULT EDUCATION PCA Article B.3 does not apply in School District No. 34 (Abbotsford).

Time is Money Join Law Insider Premium to draft better contracts faster.