Letter Report Sample Clauses

Letter Report. The Engineer shall prepare a letter report which shall include the preliminary findings. The report shall also include conceptual and generic discussions of the alternatives considered, along with a comparative cost associated with each alternative and a recommended solution. • Recommendations at this point are generic and conceptual in nature, mainly for discussions with the State and the local government entities. The recommended solution must be analyzed in detail to reflect the mitigation requirements for the roadway development. • Storm drain discussion must include the preliminary sizing of the storm drain, requirement for line rerouting, preliminary detention storage volumes (if required) based on hydrograph, and initial recommendations on mitigation of impacts on the receiving streams. • Bridge-Class and Cross-drainage Structure reports must include existing hydraulic conditions, FEMA floodplain status, proposed structure design, and proposed hydraulic conditions, preliminary detention storage volumes (if required) based on hydrograph and initial recommendations on how to mitigate the storm impact on the receiving streams.
AutoNDA by SimpleDocs
Letter Report. The Engineer shall prepare a letter report which includes the preliminary findings. The report must also include conceptual and generic discussions of the alternatives considered, along with a comparative cost associated with each alternative and a recommended solution. Recommendations at this point must be generic and conceptual in nature, mainly for discussions with the State and the local government entities. The recommended solution must be analyzed in detail to reflect the mitigation requirements for the roadway development. Cross-Drainage Structure reports must include existing hydraulic conditions, FEMA floodplain status, proposed structure DocuSign Envelope ID: F4473BF7-308E-4940-87F9-828A77C78A28 design, and proposed hydraulic conditions, preliminary detention storage volumes (if required) based on hydrograph and initial recommendations on how to mitigate the storm impact on the receiving streams.
Letter Report. RMC shall develop a letter report summarizing the assumptions and findings of the model evaluation. The report shall document improvements necessary to support new development and identify impact relative to previous model effort.
Letter Report. The Engineer shall prepare a letter report which includes the preliminary findings. The report must also include conceptual and generic discussions of the alternatives considered, along with a comparative cost associated with each alternative and a recommended solution. Recommendations at this point must be generic and conceptual in nature, mainly for discussions with the State and the local government entities. The recommended solution must be analyzed in detail to reflect the mitigation requirements for the roadway development. Cross-Drainage Structure reports must include existing hydraulic conditions, FEMA floodplain status, proposed structure design, and proposed hydraulic conditions, preliminary detention storage volumes (if required) based on hydrograph and initial recommendations on how to mitigate the storm impact on the receiving streams. DocuSign Envelope ID: F4888AB1-5DA1-49AB-A751-51413985E885
Letter Report the Engineer shall prepare a brief letter report summarizing data collection efforts and preliminary findings related to the current roadway condition. The letter report should highlight identified outfalls where additional detention volume may be required to bring the roadway system up to TxDOT design standards.
Letter Report. Prepare a letter report that summarizes V&A’s findings from the document review. V&A will verify the stated design life of the cathodic protection system and its constructability based on the project information provided and report the findings. V&A will state whether the improvements shown on the plans have the appropriate level of cathodic protection. V&A will prepare up to two letters responding to comment responses from the cathodic protection system designer.
Letter Report. DocuSign Envelope ID: FEE70723-A887-4BCC-92B5-33508013EFFC The Engineer shall prepare a letter report which includes the preliminary findings. The report must also include conceptual and generic discussions of the alternatives considered, along with a comparative cost associated with each alternative and a recommended solution. Recommendations at this point must be generic and conceptual in nature, mainly for discussions with the State and the local government entities. The recommended solution must be analyzed in detail to reflect the mitigation requirements for the roadway development. Cross-Drainage Structure reports must include existing hydraulic conditions, FEMA floodplain status, proposed structure design, and proposed hydraulic conditions, preliminary detention storage volumes (if required) based on hydrograph and initial recommendations on how to mitigate the storm impact on the receiving streams.
AutoNDA by SimpleDocs

Related to Letter Report

  • Monthly Report A. A Monthly Report shall be submitted within ten (10) calendar days of the end of each calendar month of the Period of Operation. Each Monthly Report shall be signed, dated, and certified by Concessionaire, Concessionaire’s Bookkeeper, or Accountant, and contain a Statement of Total Gross Receipts, excluding New Jersey State Sales Tax, derived by Concessionaire from operation of the Concession during the previous month. Each Monthly Report shall be based on the daily “Z” tapes or Point-of-Service (POS) device equivalent for that same month showing each day’s sales activity. Failure on the part of Concessionaire to provide the Monthly Report, when due, shall constitute a material breach of this Agreement subject to Suspension of Operations and/or Termination, in accordance with the terms and conditions set forth in Paragraphs 9 and 10. Concessionaire shall provide Department with any additional written clarification and/or information necessary to confirm the accuracy of any or all of Concessionaire’s Monthly Reports.

  • Progress Report 10.1 If required, you shall submit progress reports in connection with the Service (“Report”) on at least a monthly basis, or as we may require. The Report shall include a summary of the activities and accomplishments during the previous reporting period.

  • CMI/RAI MDS Report Recognizing the mutual objective of quality resident care, the Employer agrees to meet through the Union Management Committee with the Union as soon as practicable after the receipt of the annual CMI/RAI MDS report. The Employer agrees to provide the Union with staffing levels, and staffing mix information; the impact of related payroll costs on staffing levels and a written notice of the CMI/RAI MDS report for the facility. The purpose of this meeting is to discuss the impact of the CMI/RAI MDS report on the staffing levels in the Home, quality resident care, and provide the Union with an opportunity to make representation in that regard. The parties shall meet as necessary to discuss other changes or workload issues. The parties may invite additional participants to attend the meeting to support constructive review and discussion.

  • Monthly Reports On or before the 15th day after the end of each month during the term of this Management Agreement, Manager shall prepare and submit to Owner the following reports and statements:

  • ASSESSMENT REPORT Within 120 days following the general election held on November 2nd 2003, the returning officer of the munici- pality shall forward, in accordance with section 659.3 of the Act respecting elections and referendums in munici- palities (R.S.Q., c. E-2.2), an assessment report to the Chief Electoral Officer and the Minister setting out relevant ways to improve the trial and addressing, in particular, the following points : — the preparations for the election (choice of the new method of voting, communications plan, etc.) ; — the conduct of the advance poll and the poll ; — the cost of using the electronic voting system : – the cost of adapting election procedures ; – non-recurrent costs likely to be amortized ; – a comparison between the actual polling costs and the estimated polling costs using the new methods of voting and the projected cost of holding the general election on November 2nd 2003 using traditional methods ; — the number and duration of incidents during which voting was stopped, if any ; — the advantages and disadvantages of using the new method of voting ; — the results obtained during the addition of the votes and the correspondence between the number of ballot paper cards issued to the deputy returning officers and the number of ballot paper cards returned used and unused ; — the examination of rejected ballot papers, if it has been completed.

  • Problem Statement School bus fleets are aging, and our communities have poor air quality. Replacing school buses with zero emission school buses will address both of these issues.

  • Daily Job Reports 6.7.2.1 Developer shall maintain, at a minimum, at least one (1) set of Daily Job Reports on the Project. These must be prepared by Xxxxxxxxx's employee(s) who are present on Site, and must include, at a minimum, the following information:

  • Progress Reports The Recipient shall submit to the OPWC, at the OPWC's request, summary reports detailing the progress of the Project pursuant to this Agreement and any additional reports containing such information as the OPWC may reasonably require.

  • Invoice Certification When and if requested by DXC, as a condition precedent to payment thereof, Supplier shall separately certify each invoice as follows: “We certify that contract deliverables listed hereon were produced in compliance with all applicable requirements of Sections 6, 7, and 12 of the Fair Labor Standards Act, as amended, and of regulations and orders of the U.S. Department of Labor issued under Section 14 thereof. We further certify that any and all additional contract deliverables will be produced in compliance with same.”

  • Monthly Progress Report This report shall include a description of the activities during the reporting period and the activities planned for the ensuing reporting period. The first reporting period consists of the first full month of performance plus any fractional part of the initial month. Thereafter, the reporting period shall consist of each calendar month. The Contractor shall submit a Monthly Progress Report on or before the 15th calendar day following the last day of each reporting period and shall include the following: Title Page: The title page for this report shall include the contract number and title; the type of report and period that it covers; the Contractor’s name, address, telephone number, fax number, and e-mail address; and the date of submission.