Common use of LEGISLATIVE CHANGE Clause in Contracts

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b) shall be implemented in accordance with Clause 19.1(Variation Procedure).

Appears in 4 contracts

Samples: Framework Agreement, Model Framework Agreement, assets.crowncommercial.gov.uk

AutoNDA by SimpleDocs

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b18.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b18.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 18.1(Variation Procedure).

Appears in 4 contracts

Samples: Services Framework Agreement, Framework Agreement, Services Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices Charges as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or and Services is reasonably foreseeable known at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period Term (other than as those referred to in Clause 19.2.1(b33.2.1(b)), the Supplier shall: shall notify the Authority as soon as reasonably practicable of the likely effects of that change change, including whether any Variation change is required to the Goods and/or and Services (or Ordered Goods and Services, as appropriate), the Framework Prices or this Framework Agreement; . As soon as practicable after any notification in accordance with Clause 33.2.2, the Parties shall discuss and provide agree the Authority with evidencematters referred to in that Clause and any ways in which the Supplier can mitigate the effect of the Specific Change of Law, including: providing evidence that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; demonstrating that a foreseeable Specific Change in Law had been taken into account by the Supplier before it occurred; giving evidence as to how the Specific Change in Law has affected the cost of providing the Goods and/or and Services (or Ordered Goods and Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarkingas appropriate), has been taken into account in amending the Framework Prices. Any change increase in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred agreed by the Parties pursuant to in Clause 19.2.1(b) 33.2.3 shall be implemented in accordance with Clause 19.1(Variation Procedure)by a written variation agreement signed by the Authority Representative and the Supplier’s Representative.

Appears in 3 contracts

Samples: Framework Agreement, Framework Agreement, Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase in the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b) shall be implemented in accordance with Clause 19.1(Variation Procedure).

Appears in 2 contracts

Samples: Services Framework Agreement, Services Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.3.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.3.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1(Variation Procedure).

Appears in 2 contracts

Samples: Framework Agreement, Email Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b50.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b50.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 50.1(Variation Procedure).

Appears in 2 contracts

Samples: assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b)), the Supplier shall: notify the Authority CCS as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority CCS with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 19.1 (Variation Procedure).

Appears in 2 contracts

Samples: assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1(Variation Procedure).

Appears in 2 contracts

Samples: Authority Software, Authority Software

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b20.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b20.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 20.1 (Variation Procedure).

Appears in 2 contracts

Samples: Management Framework Agreement, Template Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b17.2.1(b)), the Supplier shall: notify the Authority Fund as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority Fund with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b17.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 17.1(Variation Procedure).

Appears in 2 contracts

Samples: Framework Agreement, www.contractsfinder.service.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b18.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b18.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 18.1(Variation Procedure).

Appears in 2 contracts

Samples: Vehicle Lease and Fleet Management Framework Agreement, Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking)) , has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1 (Variation Procedure).

Appears in 1 contract

Samples: Framework Agreement

AutoNDA by SimpleDocs

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework the Commercial Agreement nor be entitled to an increase in the Framework Prices Service Fees as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Commercial Agreement Period (other than as referred to in Clause 19.2.1(b))B9.1(b) above, the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework AgreementService Fees, the Commercial Agreement and/or Enabling Agreements; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-ContractorsContractor; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, avoided (for example expenditure which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarkingrelating to continuous improvement in termination(Value for Money), ) has been taken into account in amending the Framework PricesService Fees. Any change in the Framework Prices Service Fees or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(bB9.1(b)) shall be implemented in accordance with Clause 19.1(Variation ProcedureSchedule 16 (Variation of Commercial Agreement Form).

Appears in 1 contract

Samples: Commercial Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or and Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or and Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or and Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b) shall be implemented in accordance with Clause 19.1(Variation Procedure).

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), avoided has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1(Variation Procedure).

Appears in 1 contract

Samples: data.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase in the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or and Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or and Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or and Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b) shall be implemented in accordance with Clause 19.1(Variation Procedure).

Appears in 1 contract

Samples: Framework Agreement

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.2.1(b)), the Supplier shall: notify the Authority Fund as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority Fund with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1(Variation Procedure).

Appears in 1 contract

Samples: www.contractsfinder.service.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b16.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b16.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 16.1(Variation Procedure).

Appears in 1 contract

Samples: data.gov.uk

LEGISLATIVE CHANGE. The Supplier shall neither be relieved of its obligations under this Framework Agreement nor be entitled to an increase the Framework Prices as the result of: a General Change in Law; or a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Framework Commencement Date. If a Specific Change in Law occurs or will occur during the Framework Period (other than as referred to in Clause 19.2.1(b18.2.1(b)), the Supplier shall: notify the Authority as soon as reasonably practicable of the likely effects of that change including whether any Variation is required to the Goods and/or Services, the Framework Prices or this Framework Agreement; and provide the Authority with evidence: that the Supplier has minimised any increase in costs or maximised any reduction in costs, including in respect of the costs of its Sub-Contractors; as to how the Specific Change in Law has affected the cost of providing the Goods and/or Services; and demonstrating that any expenditure that has been avoided, for example which would have been required under the provisions of Framework Schedule 12 (Continuous Improvement and Benchmarking), has been taken into account in amending the Framework Prices. Any change in the Framework Prices or relief from the Supplier's obligations resulting from a Specific Change in Law (other than as referred to in Clause 19.2.1(b18.2.1(b) shall be implemented in accordance with Clause 19.1(Variation 18.1(Variation Procedure).

Appears in 1 contract

Samples: Postal Goods and Services Framework Agreement