Layout and Field Engineering Sample Clauses

Layout and Field Engineering. 11.4.1 All field engineering required for layout of this Work and establishing grades for earthwork operations shall be furnished by Developer at its expense. This Work shall be done by a qualified, California-registered civil engineer or licensed land surveyor approved in writing by District and Architect. Any required Record and/or As-Built Drawings of Site development shall be prepared by the approved civil engineer or licensed land surveyor.
AutoNDA by SimpleDocs
Layout and Field Engineering. All field engineering required for laying out of this Work and establishing grades for earthwork operations shall be furnished by Contractor at its expense. Such Work shall be done by a licensed surveyor or qualified engineer. Any required Record Drawings of site development shall be prepared by the approved licensed surveyor or qualified engineer.
Layout and Field Engineering. 58.1 All field engineering required for laying out this work and establishing grades for earthwork operations shall be furnished by the Contractor at his expense. Such work shall be done by a qualified civil engineer or land surveyor licensed in California and approved by the District. Any required “as-built” Drawings (or Plans) of site development shall be prepared by a qualified civil engineer or land surveyor licensed in California and approved by the District.
Layout and Field Engineering. 24.1. All field engineering if required for laying out of work and establishing grades for earthwork operations shall be furnished by CONTRACTOR at its expense. Such work shall be done by a qualified civil engineer approved by the DISTRICT.
Layout and Field Engineering. All field engineering required for laying out the Work and establishing grades for earthwork operations shall be furnished by the Contractor at its expense.
Layout and Field Engineering. 10.3.1 The Developer shall be responsible for having ascertained pertinent local conditions such as location, accessibility, and general character of the Site and for having satisfied itself as to the conditions under which the Work is to be performed. District shall not be liable for any claim for allowances because of Developer’s error or negligence in acquainting itself with the conditions at the Site.
Layout and Field Engineering. A. Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work and all necessary surveys to compute quantities of Work performed.
AutoNDA by SimpleDocs
Layout and Field Engineering. All field engineering required for layout of this Work and establishing grades for earthwork operations shall be furnished by Contractor at its expense. This Work shall be done by a qualified, California-registered civil engineer and/or licensed surveyor (as appropriate) approved in writing by District and Architect. The Contractor shall be responsible for having ascertained pertinent local conditions such as location, accessibility, and general character of the Site and for having satisfied itself as to the conditions under which the Work is to be performed. District shall not be liable for any claim for allowances because of Contractor’s error or negligence in acquainting itself with the conditions at the Site. Contractor shall protect and preserve established benchmarks and monuments and shall make no changes in locations without the prior written approval of District. Contractor shall replace any benchmarks or monuments that are lost or destroyed subsequent to proper notification of District and with District's approval.
Layout and Field Engineering. All field engineering and surveying required for laying out the Project and establishing grades for earthwork operations shall be furnished by Design-Builder at its expense. Such work shall be done by a qualified engineer. Any required “As-Built” drawings of Site development shall be prepared by a qualified engineer at Design-Builder’s expense. The Owner shall confirm the location of the corners of the Site and benchmarks.
Layout and Field Engineering. DWK DMS 3587633v1
Time is Money Join Law Insider Premium to draft better contracts faster.