Lavatory. 1. Remove trash and other debris from counters, bin and floor.
Lavatory. Lavatories shall be made available on the floor of the Building where the Leased Premises is located for the use of Tenant Parties and Tenant’s invitees, in a manner consistent with that of other similar office buildings in South San Francisco.
Lavatory bulkheads and panels Detailed visual inspection of the lavatory bulkheads and panel coverings for cracking, scratches, disbonding, discoloration, stains and tearing of covering.
Lavatory. For every 60,000 s.f. of Warehouse
Lavatory. American Standard wall hung Xxxxxxx Vitreous China 3 hole #1024.121 (20" X 18") with Delta handle faucet #2520 or equal.
Lavatory. If the Premises constitute less than an entire floor of the Building, public restroom facilities, including hot and cold running water.
Lavatory. A clear floor space complying with Section 305.3, positioned for a parallel approach, shall be provided. The clear floor space [48-inch side] shall be centered on the lavatory. EXCEPTIONS:
Lavatory. Carry out a detailed visual inspection of the Bulkheads lavatory bulkheads and panel coverings for:- Ceiling Panels : Cracking Sink Unit Panels : Scratches Toilet Unit Fairing : Disbonding Panels : Discoloration / Stains : Tearing of Material covering 03 Lavatory Floor Pan Carry out a detailed visual inspection of the / Floor covering lavatory floor pan / floor covering for (As Applicable) satisfactory condition. Replace / repair as applicable.
Lavatory e. Floor Finish: Vinyl asbestos tile. f. Base: 4" vinyl base. g. Ceiling Finish: Same as shop except ceiling height shall be 8'0".