Landscaping Allowance Sample Clauses

Landscaping Allowance. It is understood that landscaping exists within the City rights of way. Landscaping may include a variety of well established trees of large sizes, as well as small shrubs and flowers. From time to time existing landscaping may be located within the area of proposed construction. Therefore, the Contractor and Project Engineer will communicate and otherwise coordinate on impacts to existing landscaping. Where landscaping cannot be protected and must be removed (as determined by the Project Engineer), the Project Engineer shall determine if landscaping replacement is necessary. The Project Engineer may request a quote from the Contractor to replace landscaping with similar size and species. This item has been established as a fixed amount to be used through authorization of the Project Engineer to replace landscaping. Des-6: Maximum Change Allowance – Throughout construction, unforeseen conditions may arise that require immediate or eventual attention. Where these unforeseeable situations occur and they cannot be covered by an existing line item within the bid, the Project Engineer may request that the Contractor’s submit a cost estimate for work to manage the unforeseen condition. The Project Engineer may also request comparable cost estimates from other qualified construction companies. Use of this item shall adhere to Section 01028 Change Order Procedures. GR-24 PROTECTION OF WORK The Contractor and its agents shall take reasonable precautions and maintain reasonable safeguards to protect the SITE DEVELOPMENT WORK against loss or damage including, without limitation, bracing and reinforcing where necessary and providing guards, locks, fences, signs, barricades, lights and such other warning and security devices where appropriate. GR-25 ASBESTOS WORK PLAN Attention is brought to the fact that asbestos cement pipe (AC) may be encountered on this job. The Contractor engaged in the repair, removal and maintenance of asbestos cement pipe (AC) will follow the Asbestos Work Plan as outlined in Section 02051 of the Technical specifications. This work plan should be considered as minimal guidelines for the disturbance of the material. The Contractor shall utilize all appropriate controls and work practices necessary to protect workers, people in the vicinity of the work area, and the environment, regardless of the inclusion or exclusion of this work plan. Contractor questions should be resolved prior to the start of the abatement project. The primary concerns and ...
AutoNDA by SimpleDocs
Landscaping Allowance. It is understood that landscaping exists within the City rights of way. Landscaping may include a variety of well established trees of large sizes, as well as small shrubs and flowers. From time to time existing landscaping may be located within the area of proposed construction. Therefore, the Contractor and Project Engineer will communicate and otherwise coordinate on impacts to existing landscaping. Where landscaping cannot be protected and must be removed (as determined by the Project Engineer), the Project Engineer shall determine if landscaping replacement is necessary. The Project Engineer may request a quote from the Contractor to replace landscaping with similar size and species. This item has been established as a fixed amount to be used through authorization of the Project Engineer to replace landscaping
Landscaping Allowance. Landlord shall contribute an allowance up to the amount of One Hundred Seventy-Five Thousand Two Hundred Fifty and No/100 Dollars ($175,000.00) (the "Landscaping Allowance"), which Tenant may use solely for the design and installation of landscaping around the Leased Premises. In the event Tenant's landscaping costs exceed the Landscaping Allowance, the excess shall be paid by Tenant to Landlord fifty percent (50%) before the commencement of the change order work and fifty percent (50%) within ten (10) days of receipt of an invoice for same.
Landscaping Allowance. Where warranted, VGS will compensate Grantor an additional amount of ___________________________ Dollars ($____.00) for post-construction landscaping improvements (the “Landscaping Allowance”), described as follows: [Insert description of what is being paid for / replaced.] VGS will make the Landscaping Allowance at the time of Closing. Grantor’s acceptance of the Landscaping Allowance will release VGS from any additional obligation to return any affected lands during the pipeline’s construction to their previous condition, but not VGS’s obligation to otherwise comply with VGS’s certificate of public good and all permits and other approvals related to the project. Drainage Tile. VGS may adjust the location of the Easement Area [and Temporary Areas] to minimize the impact to existing drainage tile on the Property in the pipeline’s vicinity. If the adjustment results in increased acreage for the Easement Area [and Temporary Areas], VGS will compensate Grantor for the additional land (applying the same price per square foot as for the Easement Area [and Temporary Areas]). If the adjustment results in increased remainder damages to the Property, VGS will compensate Grantor for the additional remainder damages. VGS will be responsible for restoring the drainage tile to Grantor’s reasonable satisfaction if it is encountered during the pipeline’s construction.
Landscaping Allowance. The Price includes a landscaping allowance in the amount of $4,500,000 which shall be used to cover the costs of landscaping elements in accordance with Section 15 of the Technical Provisions and the Landscaping Plan approved by TxDOT pursuant to Section 15 of the Technical Provisions. The landscaping allowance shall not be used to cover the costs of any aesthetics elements of the Project which are otherwise included in the Price. The aesthetics elements for the Project shall be consistent with the Houston District Green Ribbon Guidelines included in the Reference Information Documents. TxDOT shall have the right at any time to reduce the Price by an amount equal to that portion of the landscaping allowance that TxDOT has determined it will not use, and in no event shall less than the full amount of the allowance be used without TxDOT’s prior written approval. If funds remain available in such allowance following achievement of Final Acceptance, the Price shall be reduced by an amount equal to such remaining allowance amount.
Landscaping Allowance. The Price includes a landscaping allowance for Segment 1 in the amount of $1,300,000 and a landscaping allowance for Segment 2 in the amount of $700,000, which shall be used to cover the costs of landscaping elements in accordance with Section 15 of the Technical Provisions and the Landscaping Plan approved by TxDOT pursuant to Section 15 of the Technical Provisions. The landscaping allowance shall not be used to cover the costs of any aesthetics elements of the Project which are otherwise included in the Price. The aesthetics elements for the Project shall be consistent with the Houston District Green Ribbon Guidelines included in the Reference Information Documents. TxDOT shall have the right at any time to reduce the Price by an amount equal to that portion of the landscaping allowance that TxDOT has determined it will not use, and in no event shall less than the full amount of the allowance be used without TxDOT’s prior written approval. If funds remain available in such allowance following achievement of Final Acceptance, the Price shall be reduced by an amount equal to such remaining allowance amount.
Time is Money Join Law Insider Premium to draft better contracts faster.