Landings Sample Clauses

Landings. After landings have served Purchaser’s purpose, Purchaser shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize ero- sion.
AutoNDA by SimpleDocs
Landings. After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to re- move overhangs and otherwise minimize erosion.
Landings. The locations and extent of all new landings shall be approved in advance by the Sale Officer.
Landings. 1. The designated port for landing activities in the Seychelles is Victoria, Mahé.
Landings. All stumped landings shall be reclaimed within two years after harvesting and reforested to meet provincial regeneration standards associated with the site.
Landings. Community tuna vessels which opt to land their catches in a Malagasy port shall benefit from a reduction of EUR 5 per tonne fished in Madagascar’s fishing zone in the fee indicated in point 2 of Section 2 of Chapter 1 of the Annex. An additional reduction of EUR 5 shall be granted where fisheries products are sold to a processing factory in Madagascar. This mechanism shall apply, for all Community vessels, up to a maximum of 50 % of the final statement of catches (as defined in Chapter III of the Annex) from the first year of this Protocol.
Landings. Ramps shall have level landings at bottom and top of each run.  See Figures 9 and 12 for required compliance  Near Unit #1113: o grind or relevel concrete sidewalk to 2% grade or less on cross slope
AutoNDA by SimpleDocs
Landings. Landings shall be planned by the Professional Timber Harvester trained logger to facilitate safe and efficient operations while causing the least damage to the soil and surrounding forest. Landings should be no larger than needed to facilitate an efficient harvesting operation. Landing location and use must follow the current Missouri Watershed Protection Practices guide. All non- merchantable products at the landing must be removed OR returned and scattered throughout the interior of the sale area. All bark and wood chips left on the landing must be scraped off. The landing should then be back-bladed or prepped for seeding.
Landings. One (1) Claim (if nine (9) landings flown) – twenty (20) minutes pay but no additional credit
Landings. A level landing is allowed to be sloped up to 2% to accommodate drainage. For curb ramp landing guidance, see Section 4.3.8 of this DIB. This DIB does not discuss the situation where a door opens onto a landing at a building entrance. For this situation, as well as with any building egress design, refer to California Building Code Section 1003.3.4.4 and confer with the Office of Transportation Architecture in the Division of Engineering Services. Landings shall be designed as following:
Time is Money Join Law Insider Premium to draft better contracts faster.