IT connections Sample Clauses

IT connections. ‌ Swissgrid may independently elaborate the provisions of the Transmission Code relating to the IT connection of generating units (with regard to both online data transmission and decentralised data recording) in further detail. Swissgrid will inform the Contract Partner in writing of such an undertaking. Swissgrid will consult the companies concerned in advance and request their opinion. These provisions are binding upon publication on the Swissgrid website. Such regulations equate to prequalification criteria; therefore the transition periods for compliance with modified specifications in the case of changes to the specifications for IT connections, for example, are the same as those in the case of changes to the prequalification criteria.
AutoNDA by SimpleDocs

Related to IT connections

  • Internet Connection In order to ensure the proper functioning of the Production Monitor and the Consumption Monitor, if possible, you must provide the Solar System with continuous access to a functioning broadband internet connection with one (1) wired Ethernet port and standard electrical outlet, at your cost. If you are unable to provide the Solar System with an internet connection in accordance with the foregoing sentence, the Home must be located in an area with cellular service that is acceptable to us in our discretion.

  • Cross Connection For a collocation arrangement, the facilities between the collocating Party’s equipment and the equipment or facilities of the housing Party (such as the housing Party’s digital signal cross connect, Main Distribution Frame, or other suitable frame or panel).

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Internet Connectivity School must provide sufficient hardline internet connectivity and the required network configurations (provided in Exhibit A) for each Pixellot System to allow live broadcasts. PlayOn will provide the point-to-point wireless internet base station (“Point to Point”) when needed to deliver hardline internet connectivity to Pixellot Systems installed in outdoor venues; provided that PlayOn is able to select the make and model of the Point to Point system. In the event that School requests, or requires, a specific Point to Point system that is different from what is provided by PlayOn, then School must provide and install the Point to Point system at its own expense.

  • Developer and Connecting Transmission Owner agree to report to each other in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

  • Network Facilities At the time of termination, the Transmission Provider and the Interconnected Entities shall keep in place any portion of the Interconnection Facilities that the Transmission Provider deems necessary for the safety, integrity and/or reliability of the Transmission System. Otherwise, Transmission Provider may, in its discretion, within 30 days following termination of Interconnection Service, require the removal of all or any part of the Interconnection Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.