IoT-A Architecture Reference Model Sample Clauses

IoT-A Architecture Reference Model. ‌ The main aim of the IoT-A project is to propose an IoT architecture reference model (ARM). The intended usage of the ARM is the following: • To serve as a cognitive aid – guiding discussions since it provides a common language to everyone involved and helping in identifying independent building blocks of an IoT system; • Common grounding – definition of IoT entities and describing their basic interactions and relationships with each other, i.e. the ARM provides common concepts that should be used to build compliant IoT systems; • Generation of architecture – IoT ARM can be used for the generation of compliant architectures for specific systems using provided best practices, facilitating creation of interoperable IoT systems; • Benchmarking – standardized description, ordering and delineation of components provide a high level of transparency and inherent comparability to the benchmarking process. The relationship between reference architecture, architectures and the actual systems is outlined in Figure 1. Reference models and reference architectures provide a description of greater abstraction than what is inherent to actual systems and applications. They are more abstract than system architectures that have been designed for a particular application with particular constraints and choices. Guidance in the form of best practices can be associated to reference architecture in order to derive use-case-specific architectures from the reference architecture.
AutoNDA by SimpleDocs

Related to IoT-A Architecture Reference Model

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Reference Materials The Board agrees to continue to make available to employees the reference materials maintained by the district. Principals are encouraged to provide additional reference materials of high use in schools where feasible.

  • Reference Description Dates E/CAM/0305 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0306 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0307 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0308 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0309 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0310 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0311 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 Reference Description Dates E/CAM/0312 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0313 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0314 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0315 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0316 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0317 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0318 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0319 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0320 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0321 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0322 Deeds Grounds in Xxxxxxxx Xxxxxx xxx Xxxxxxx Xxxxxx; 1-21 (incl) St Paul's Terace, King's Road; six messuages in Canal Terrace, fronting Regent's Canal 1824-1832

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Five Day Work Week Schedule When working under the five (5) day work week schedule, Employees shall receive one and one-half (1.5x) times their regular rate of pay for the first two (2) hours of overtime Monday through Friday. All other overtime Monday through Friday shall be paid at double time (2x).

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Alternative Work Schedules Alternative work schedule means an approved schedule for an Employee that deviates from the work week described in Section 1, Section 2, or a schedule that deviates from a worksite’s normal schedule. Employees who work a “shift work schedule” as part of a rotating group of individuals who must continuously maintain a 24-hour operation or facility are not eligible for an alternative work schedule.

Time is Money Join Law Insider Premium to draft better contracts faster.