Installation scheduling Sample Clauses

Installation scheduling. 2. When making comparisons with another company’s products and services, Personnel and Representatives must use truthful information based on facts that can be objectively substantiated.
AutoNDA by SimpleDocs
Installation scheduling. Contractor shall accommodate customer’s preference and needs in regards to scheduling and conducting installation work, including pre‐installation site visits Monday – Friday, between 8:00 a.m. and 5:00 p.m. Initial site visits are to be scheduled within thirty (30) days and installation services are to be within forty‐five (45) days from the customer’s application approval for program participation, assuming no extenuating circumstances by the customer. Contractor is to work with the property owner to work in a safe, courteous, and professional manner; and to clean up, removing all debris and materials from each site at the end of the work day. Normal Site Conditions: Prior to performing any work, Contractor shall pre‐inspect each site to ensure Normal Site Installation Conditions exist at the site including: • Residential home within Solano County service area • Measured total square footage of project area is between three hundred (300) and two thousand (2000) square feet. • Outdoor irrigation is in moderate to good working order and can be converted to drip irrigation or hand watering without major repair to main line or new installation of outdoor irrigation system. • Existing landscape to be replaced is identifiable as being lawn or sod within the past five (5) years. Abnormal Site Conditions: Sites not meeting the “Normal Site Conditions” may not be eligible for the program. Contractor shall inform SCWA of the condition(s) that do not meet Normal Site Conditions within 7 days of inspection. Any repairs necessary to make the site meet the Normal Site Condition criteria are NOT part of this project scope of work and are, therefore, NOT reimbursable by SCWA.
Installation scheduling. The contractor must be able to conform to BrightRidge’s scheduling procedures to minimize customer installation backlogs. The contractor shall maintain a workforce capable of completing aerial installations within a maximum of three days (Monday- Saturday) or five days for underground installations, including facility location time. For installations that involve telephone number portability, the maximum installation scheduling timeframe will include the time required for porting the telephone number. In the event that installation scheduling exceeds the above timeframes for more than one week, the contractor must be able to provide additional personnel within one week to provide adequate manpower to reduce and sustain the installation backlog to within the required timeframes. Subcontractors may be used for backlog reduction. BrightRidge plans to utilize NISC IVUE Connect as its OSS/BSS solution for scheduling, service orders and work orders.
Installation scheduling. The Court will determine the schedule for the installation and notify the contractor as to when installation can begin. Installation schedule will be determined by the Judge’s courtroom calendar.

Related to Installation scheduling

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Punchlist Upon completion of the Performance Tests and prior to Substantial Completion of a Subproject, Owner and Contractor shall inspect the Subproject, and Contractor shall prepare a proposed Punchlist of items identified as needing to be completed or corrected as a result of such inspection. Contractor shall promptly provide the proposed Punchlist to Owner for its review, together with an estimate of the time and cost necessary to complete or correct each Punchlist item. Contractor shall add to the proposed Punchlist any Punchlist items that are identified by Owner within ten (10) Days after Owner’s receipt of the proposed Punchlist from Contractor, and Contractor shall immediately initiate measures to complete or correct, as appropriate, any item on Contractor’s proposed Punchlist (including those items identified by Owner during Owner’s review) that are not of a Punchlist nature. Notwithstanding anything to the contrary in this Agreement, Contractor and Owner are not required as a condition of Substantial Completion of a Subproject to agree upon and identify every Punchlist item and include it on the Punchlist, but Contractor is required to complete as a condition of Substantial Completion of such Subproject that does not meet the definition of Punchlist as provided in Section 1.1. In the event of a dispute regarding whether a specific item of Work meets the definition of Punchlist under Section 1.1, the Parties shall resolve such dispute in accordance with Section 18.1A. Owner shall provide Contractor with access to the Work after Substantial Completion of a Subproject sufficient to enable Contractor to complete all Punchlist items, so long as such access does not unreasonably interfere with operation of a Subproject after Substantial Completion of the Subproject or the Existing Facility and subject to any reasonable security or safety requirements of Owner. Upon Contractor’s completion or correction of any items necessary to achieve Substantial Completion of a Subproject, as modified by any Owner additions, such Punchlist shall govern Contractor’s performance of the Punchlist items up to Final Completion. All Work on the Punchlist shall be completed by the date required for Final Completion, as specified in Section 5.3C, or Owner may, in addition to any other rights that it may have under this Agreement, complete such Punchlist Work at the expense of Contractor. In the event Owner elects to complete such Punchlist Work, Contractor shall pay Owner, within ten (10) Days after receipt of written notice from Owner, all reasonable costs and expenses incurred by Owner in performing such Punchlist Work, or, at Owner’s sole discretion, Owner may withhold or offset amounts owed to Contractor or collect on the Letter of Credit in accordance with Section 7.8 in the amount of such costs and expenses. Any Defective Work identified after agreement between the Parties of the Punchlist shall be corrected by Contractor as a Warranty item under Article 12.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Plans and Specifications Tenant shall be solely responsible for the preparation of the final architectural, electrical and mechanical construction drawings, plans and specifications (called “plans”) necessary for Tenant to construct the Premises for Tenant’s occupancy, which plans shall be subject to approval by Landlord’s architect and engineers and shall comply with their reasonable requirements to avoid aesthetic or other conflicts with the design and function of the balance of the Building. Landlord’s approval is solely given for the benefit of Landlord, and neither Tenant nor any third party shall have the right to rely upon Landlord’s approval of Tenant’s plans for any purpose whatsoever other than that Landlord does not object thereto under this Lease. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan submission by Tenant within 8 business days after Landlord’s receipt thereof. If Landlord fails to respond to any such submission within such 8 business day period, which failure continues for more than 2 business days after Tenant gives Landlord a written notice (the “Deemed Approved Notice”) advising Landlord that such plan submission shall be deemed approved within 2 business days of Landlord’s receipt of the Deemed Approved Notice, then such plan submission shall be deemed approved hereunder. The Deemed Approved Notice shall, in order to be effective, contain on the first page thereof, in a font at least twice as large as the font of any other text contained in such notice, a legend substantially as follows: “FAILURE TO RESPOND TO THIS NOTICE WITHIN TWO (2) BUSINESS DAYS AFTER RECEIPT HEREOF SHALL CONSTITUTE LANDLORD’S APPROVAL OF SUBMITTED PLANS.” In the event Landlord’s architect’s or engineers’ approval of Tenant’s plans is withheld or conditioned, Landlord shall send prompt written notification thereof to Tenant and include a reasonably detailed statement identifying the reasons for such refusal or condition, and Tenant shall promptly have the plans revised by its architect to incorporate all reasonable objections and conditions presented by Landlord and shall resubmit such plans to Landlord. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan re-submission by Tenant within 8 business days after Landlord’s receipt thereof. Such process shall be followed until the plans shall have been approved by Landlord’s architect and engineers without unreasonable objection or condition. Without limiting the foregoing, Tenant shall be responsible for all elements of the design of Tenant’s plans (including, without limitation, compliance with law, functionality of design, the structural integrity of the design, the configuration of the Premises and the placement of Tenant’s furniture, appliances and equipment), and Landlord’s approval of Tenant’s plans shall in no event relieve Tenant of the responsibility for such design. Tenant agrees it shall be solely responsible for the timely preparation and submission of all such plans and for all elements of the design of such plans and for all costs related thereto. (The word “architect” as used in this Section 3.2 shall include an interior designer or space planner.) Tenant shall reimburse Landlord Landlord’s reasonable out-of-pocket expense incurred in connection with the review of Tenant’s plans.

  • Rooftop Equipment Provided that Tenant complies with the terms of ----------------- this Section, Tenant may, at its risk and expense, install a satellite dish and related communications equipment and wiring (collectively, the "Rooftop ------- Equipment") on the roof of the Building at a location approved by Landlord, --------- which equipment may be used solely by Tenant and its Permitted Transferees or Permitted Sublessees. Before installing the Rooftop Equipment, Tenant shall submit to Landlord for its approval (which approval shall be in Landlord's sole discretion) plans and specifications which (a) specify in detail the design, location, size, and, in the case of a satellite dish, frequency of the Rooftop Equipment and (b) are sufficiently detailed to allow for the installation of the Rooftop Equipment in a good and workmanlike manner and in accordance with all Laws (the "Legal Requirements"). If Landlord approves of such plans, Tenant ------------------ shall install (in a good and workmanlike manner), maintain and use the Rooftop Equipment in accordance with all Legal Requirements and shall obtain all consents and permits required for the installation and operation thereof; copies of all such permits and evidence of such consents must be submitted to Landlord before Tenant begins to install the Rooftop Equipment. Tenant shall thereafter maintain all permits necessary for the maintenance and operation of the Rooftop Equipment while it is on the Building and operate and maintain the Rooftop Equipment in such a manner so as not to unreasonably interfere with any other satellite, antennae, or other transmission facility on the Building's roof or in the Building. Landlord may require that Tenant screen the Rooftop Equipment with a parapet or other screening device acceptable to Landlord. Tenant shall maintain the Rooftop Equipment and screening device in good repair and condition. Tenant shall, at its risk and expense, remove the Rooftop Equipment (including all wiring related thereto), within five days after the occurrence of any of the following events: (1) the termination of Tenant's right to possess the Premises; (2) the termination of the Lease; (3) the expiration of the Term; or (4)

  • Scheduling i) The designated employer will provide the employee with their schedule of shifts in accordance with the collective agreement for both homes. [Insert the split/sharing of shift numbers here] Similarly, the employee will submit all requests for time off including vacation to the designated employer in accordance with the collective agreement.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.