Initial Narration Sample Clauses

Initial Narration. If the DDD does not respond, within seven calendar days, to the request for approval of the Initial Narration formulated by the Narrator, (or to the new revision of the Initial Narration requested by the DDD), Tektime will send the DDD an e-mail with the invitation for approval. If the DDD does not even respond to Tektime's request, approval will be given automatically by the system, as if it had been authorized by the DDD itself. In the event that the DD has established a Narration Contribution, the automatic approval cannot be applied and will proceed as indicated in section 5.3 point a).
AutoNDA by SimpleDocs

Related to Initial Narration

  • Program Narrative All restricted xxxxxx courses which are taught for the purpose of qualifying an individual for restricted xxxxxx license to practice barbering shall consist of a minimum of 1200 hours of training to prepare each restricted xxxxxx to service their communities.

  • Budget Narrative Services are strictly paid as cost reimbursement. No funds will be paid for services not provided.

  • Narrative Commentary covering site improvements, circulation, organization of building space in relation to program requirements, building materials, special features, building systems (HVAC, plumbing, fire protection, structural, security, and video voice and data).

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • Project Team Cooperation Partnering 1.1.3 Constitutional Principles Applicable to State Public Works Projects.

  • Proposing Integration Activities in the Planning Submission No integration activity described in section 6.3 may be proposed in a CAPS unless the LHIN has consented, in writing, to its inclusion pursuant to the process set out in section 6.3(b).

  • Annual Negotiations Negotiations will be conducted each year according to the ground rules as mutually agreed upon prior to negotiations. Ground Rules (see APPENDIX F - GROUND RULES) used at the previous year's sessions will serve as the basis for discussing any changes before adopting ground rules for the current negotiating sessions. Such ground rules mutually agreed upon shall assist in the orderly process for negotiations.

  • Traditional Medicine Cooperation 1. The aims of Traditional Medicine cooperation will be: (a) to build on existing agreements or arrangements already in place for Traditional Medicine cooperation; and (b) to promote information exchanges on Traditional Medicine between the Parties. 2. In pursuit of the objectives in Article 149 (Objectives), the Parties will encourage and facilitate, as appropriate, the following activities, including, but not limited to: (a) encouraging dialogue on Traditional Medicine policies and promotion of respective Traditional Medicine; (b) raising awareness of active effects of Traditional Medicine; (c) encouraging exchange of experience in conservation and restoration of Traditional Medicine; (d) encouraging exchange of experience on management, research and development for Traditional Medicine; (e) encouraging cooperation in the Traditional Medicine education field, mainly through training programs and means of communication; (f) having a consultation mechanism between the Parties' Traditional Medicine authorities; (g) encouraging cooperation in Traditional Medicine therapeutic services and products manufacturing; and (h) encouraging cooperation in research in the fields of Traditional Medicine in order to contribute in efficacy and safety assessments of natural resources and products used in health care.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

Time is Money Join Law Insider Premium to draft better contracts faster.