Infrastructure constraints Sample Clauses

Infrastructure constraints. The goal of this task is to evaluate and document the constraints for developing the infrastructure options. The anticipated constraints that the contractor will evaluate include ocean and land use, environmental conditions, regulatory challenges, existing market systems, and other constraints to developing the conceptual infrastructure options as directed by the CSG. The Contractor shall: • Evaluate and document constraints associated with the infrastructure options. Deliverables: • A technical memo documenting the constraints associated with the infrastructure options.
AutoNDA by SimpleDocs
Infrastructure constraints. ‌ 27 As it the case with all water systems, the City of Santa Xxxx water system’s operation is limited by a 28 number of infrastructure constraints. Chief among these is the inability of the Xxxxxx Xxxx Water 29 Treatment Plant to efficiently treat waters with turbidities over about 15 nephelometric turbidity 30 units10 (NTU). Additional infrastructure constraints involve the limited hydraulic capacity and pressure 31 constraints of the existing pipeline between the Xxxxxx Booster Station and Loch Lomond Reservoir. 32 Another constraint that could further improve performance once the pipeline between Xxxxxx and 33 Loch Lomond is replaced is the capacity of the existing Xxxxxx pumps. 10 nephelometric turbidity units (NTU) is a measure of water clarity that is used in drinking water treatment and safe drinking water regulations.
Infrastructure constraints. With direction from the interstate project team, the contractor will evaluate and document the constraints for developing the infrastructure options. The anticipated constraints that the contractor will evaluate include ocean and land use, environmental conditions, regulatory challenges, existing market systems, and other constraints to developing the conceptual infrastructure options as directed by the interstate project team.

Related to Infrastructure constraints

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Environmental constraints and management Describe or cross refer to environmental constraints applicable to the Contractor’s plan and his activities on the Affected Property and how they should be managed. Include here or cross refer to an Annexure to the Service Information. The Contractor shall comply with the environmental criteria and constraints stated in Annexure

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • Pre-Construction Conference Participate in a pre-construction conference prior to commencement of Work at the Site.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.