Infrared Thermography Sample Clauses

Infrared Thermography. Testing agency shall survey entire roof area using infrared color thermography according to ASTM C1153.
AutoNDA by SimpleDocs
Infrared Thermography. Infrared thermography (IRT) is used to produce an image of the thermal energy emitted from the surface of a material. The emitted energy is typically presented in the image as surface temperature. Anomalies in the surface temperature are assessed to identify subsurface defects such as voids or delamination, or surface defects such as cracks or spalls. The defects alter the local heat transfer properties of the material, producing an anomaly in the surface temperature at the location of the defect. The contrast in surface temperature between areas where there is a defect and intact areas of material facilitates the detection of the defects. Active or passive heating may be used to induce heat transfer to produce the anomalies in surface temperature. Active heating consists of applying heat to the surface of the material in the area to be imaged with IRT and capturing images during the heating or cooling of the surface. Passive heating typically consist of diurnal weather patterns that result in heating during the daytime and cooling at night. IRT has been successfully used for the detection and measurement of surface and subsurface defects in reinforced concrete structures, including cracking and delamination. However, the depth and thickness of the subsurface defect is not easily determined without supporting experimental or numerical calibration data. Conventional IRT technologies are generally ineffective in identifying or quantifying grout and strand conditions for embedded post-tensioning steel ducts, primarily because of the cover depth and relatively small dimensions of the duct.
Infrared Thermography infrared imaging may be used to identify areas of air leakage and gaps in the thermal envelope. Except at the roof, effective testing requires a minimum of 18⁰F of temperature difference between the inside and outside of the building and should be performed after sundown (particularly on the roof) or before sunup to minimize solar influence. It is preferable to obtain infrared images from the interior of the wall assembly, since most wall systems are built with cavities between the veneer and the structural wall, where the air barrier plane is located. Infrared images of the exterior wall surface will often show temperature anomalies at weeps and other designed openings in the veneer system. To perform thermography, the building is placed under negative or positive pressure using the building’s HVAC system. Infrared testing is usually performed concurrently with the Air Infiltration testing described above, to make use of the air pressure differential created during the ASTM E779 test.

Related to Infrared Thermography

  • Cryptography Supplier will maintain policies and standards on the use of cryptographic controls that are implemented to protect Accenture Data.

  • Diagnostic procedures to aid the Provider in determining required dental treatment.

  • Bibliography [Ben83] Xxxxxxx Xxx-Or. Another advantage of free choice (extended ab- stract): Completely asynchronous agreement protocols. In Proceed- ings of the second annual ACM symposium on Principles of distrib- uted computing, pages 27–30. ACM, 1983. [BG89] Xxxxx Xxxxxx and Xxxx X Xxxxx. Asymptotically optimal distributed consensus. Springer, 1989. [BGP89] Xxxxx Xxxxxx, Xxxx X. Xxxxx, and Xxxxxxx X. Xxxxx. Towards optimal distributed consensus (extended abstract). In 30th Annual Symposium on Foundations of Computer Science, Research Triangle Park, North Carolina, USA, 30 October - 1 November 1989, pages 410–415, 1989. [BT85] Xxxxxxx Xxxxxx and Xxx Xxxxx. Asynchronous consensus and broadcast protocols. Journal of the ACM (JACM), 32(4):824–840, 1985. [DGM+11] Xxxxxxxx Xxxxx, Xxxxxx Xxx Xxxxxxxx, Xxxxxx Xxxxxx, Xxxxxx Xxxxxxxxx, and Xxxxxxxxx Xxxxxxxxxx. Stabilizing Consensus with the Power of Two Choices. In Proceedings of the Twenty-third Annual ACM Symposium on Parallelism in Algorithms and Architectures, SPAA, June 2011. [DS83] Xxxxx Xxxxx and X. Xxxxxxx Xxxxxx. Authenticated algorithms for byzantine agreement. SIAM Journal on Computing, 12(4):656–666, 1983. [FG03] Xxxxxxxx Xxxxx and Xxxx X Xxxxx. Efficient player-optimal protocols for strong and differential consensus. In Proceedings of the twenty- second annual symposium on Principles of distributed computing, pages 211–220. ACM, 2003.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Programming (a) Pursuant to Section 624 of the Cable Act, the Licensee shall maintain the mix, quality and broad categories of Programming set forth in Exhibit 4, attached hereto and made a part hereof. Pursuant to applicable federal law, all Programming decisions, including the Programming listed in Exhibit 4, attached hereto, shall be at the sole discretion of the Licensee.

  • Product ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User(s) shall have thirty (30) days from the date of delivery to accept hardware products and sixty (60) days from the date of delivery to accept all other Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty (30) day increment. Authorized User shall notify Contractor of acceptance upon successful completion of the documented installation test. Such cancellation shall not give rise to any cause of action against the Authorized User for damages, loss of profits, expenses, or other remuneration of any kind. If the Authorized User elects to provide a deficiency statement specifying how the Product fails to meet the specifications within the testing period, Contractor shall have thirty (30) days to correct the deficiency, and the Authorized User shall have an additional sixty (60) days to evaluate the Product as provided herein. If the Product does not meet the specifications at the end of the extended testing period, Authorized User, upon prior written notice to Contractor, may then reject the Product and return all defective Product to Contractor, and Contractor shall refund any monies paid by the Authorized User to Contractor therefor. Costs and liabilities associated with a failure of the Product to perform in accordance with the functionality tests or product specifications during the acceptance period shall be borne fully by Contractor to the extent that said costs or liabilities shall not have been caused by negligent or willful acts or omissions of the Authorized User’s agents or employees. Said costs shall be limited to the amounts set forth in the Limitation of Liability Clause for any liability for costs incurred at the direction or recommendation of Contractor.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Insulin Insulin will be treated as a prescription drug subject to a separate copay for each type prescribed.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Metadata Bibliographical, structural & descriptive data of the Licensed Material as defined in Schedule 5.

Time is Money Join Law Insider Premium to draft better contracts faster.