Increase in Total Price Sample Clauses

Increase in Total Price any increase in the Total Price due to increase in measurement of the Said Flat, at the rate at which the Total Price has been computed, wholly.
AutoNDA by SimpleDocs
Increase in Total Price. Any increase/decrease in the Total Price due to increase/decrease in the measurement of the Said Apartment, at the rate at which the Total Price of the Said Apartment has been computed.
Increase in Total Price any increase in the Total Price due to increase in measurement of the Said Apartment, at the rate at which the Total Price has been computed, wholly. S CHEDULE ‘D’ Specifications Structure: Earthquake resistant RCC framed structure Brickwork: Eco-friendly brickwork with Autoclaved Aerated Concrete (AAC) blocks used for better quality, thermal insulation, reduction of damp Foundation: Pile foundation for durability and stability Living Room/ Dining Area: Flooring: Vitrified tiles (2x2 feet) Wall: POP finish Ceiling: POP finish Main Door: Flush door with teak finish on the external side Windows: Anodized aluminum with clear glazing Electrical: Concealed wiring with modular switches of reputed make, Provision for telephone and television points. Provision for split AC System including drainage pipe Balcony: Door: Aluminum sliding door with full glazing Railing: MS railing Electrical: Provision of washing machine point Bedrooms: Flooring: Vitrified tiles (2 x 2 feet) Wall: POP finish Ceiling: POP finish Door: Flush door Window: Anodized aluminum with clear glazing Electrical: Concealed wiring with modular switches of reputed make, Provision for television point in master bedroom Provision for split AC System including drainage pipe Kitchen: Flooring: Anti skid ceramic tiles Wall: POP finish, wall tiles up to 2 (two) feet height on all around wall over kitchen counter Ceiling: POP finish Windows: Anodized aluminum with clear glazing Counter: Granite Slab with a stainless steel sink Electrical: Concealed wiring with modular switches of reputed make, Points for refrigerator, water purifier, microwave and exhaust fan/ chimney Toilet: Flooring: Anti-skid ceramic tiles Wall: Ceramic tiles up to door height Ceiling: POP finish Door: Flush door Sanitary xxxx: Sanitary xxxx of Hindware/Parryware or equivalent make CP Fittings: C P Fittings from Hindware/Parryware or equivalent make Electrical- Concealed wiring with modular switches of reputed make, Provision for light, geyser and exhaust fan points Lifts: Automatic 2 (Two) high speed elevators of reputed make plus 1 (One) stretcher lift in each block Ground Floor Lobby: Elegant ground floor lift lobby and lift facade Common Area: POP with paint finish Outdoor Finish: Waterproof acrylic based paint NOTE: Vitrified tiles, Marbles & Granite: Vitrified tiles are made of clay with pigments, Marble & Granite are stone materials containing veins, fissures and with tonal differences. There will be colour and markings caused by...

Related to Increase in Total Price

  • Total Price 36.1.1 The Allottee shall make the payment of the Total Price as per the payment plan set out in Schedule C. The Promoter may from time to time raise demand as per Payment Schedule for payment of installments by issuing notices to the Allottee and the Allottee shall make the payments promptly within the time stipulated in such notices.

  • Maximum Total Payment Including the reimbursable expenses shown above (if any), the maximum total payment under this Contract is $ ; this is a not-to-exceed amount, and the District will not pay more than this amount unless specifically agreed to in an amendment executed by the parties.

  • Increase in Hours 6.4.1 For unit - 1 When additional hours are available to a part-time position on a regular basis, the hours shall be offered to the employee in the unassigned time with the greatest bargaining unit seniority. If the senior employee declines the assignment, it shall be offered to the remaining employees in the class in descending order of bargaining unit seniority until the assignment is made.

  • Price Increase For purposes of this paragraph, “Contract Year” means a twelve

  • Price Increase/Decrease No price increases will be permitted during the first period of the price agreement. The County requires documented proof of cost increases on Contracts prior to any price adjustment. A minimum of 30-days advance notice in writing is required to secure such adjustment. No retroactive price adjustments will be considered. All price decreases will automatically be extended to the County of Orange. The County may enforce, negotiate, or cancel escalating price Contracts or take any other action it deems appropriate, as it sees fit. The net dollar amount of profit will remain firm during the period of the Contract. Adjustments increasing the Contractor’s profit will not be allowed.

  • Price Increase/Decreases No price increases will be permitted during the first period of the Contract. The County requires documented proof of cost increases on Contracts prior to any price adjustment. A minimum of 30-days advance notice in writing is required to secure such adjustment. No retroactive price adjustments will be considered. All price decreases will automatically be extended to the County of Orange. The County may enforce, negotiate, or cancel escalating price Contracts or take any other action it deems appropriate, as it sees fit. The net dollar amount of profit will remain firm during the period of the Contract. Adjustments increasing the Contractor’s profit will not be allowed.

  • Reimbursable Expenses; Maximum Total Payment; Invoicing District will make no payment until this Contract is fully executed by the authorized representatives of both parties.

  • CONTRACT PRICE/PRICE LIMITATION/ PAYMENT 5.1 The contract price, method of payment, and terms of payment are identified and more particularly described in EXHIBIT C which is incorporated herein by reference.

  • Price Increases This section applies to pricing not Benchmarked to GSA Supply Schedule. Additionally, where pricing submitted for Services is not benchmarked to an approved GSA Supply Schedule:

  • Supervisory Differential Adjustment 99. The Appointing Officer may adjust the compensation of a supervisory employee whose schedule of compensation is set herein subject to the following conditions:

Time is Money Join Law Insider Premium to draft better contracts faster.