Improved and Unimproved Rates Sample Clauses

Improved and Unimproved Rates. Rent for the above-described parcel shall be at the current rate of $0. per square foot of improved land and $0. per square foot of unimproved land. The Premises consist of the following square footage of improved and unimproved land: Parcel Area Rate Subtotal A. ( x ) sq. feet Improved Land- $0. B. ( x ) sq. feet Unimproved Land- $0. Total =
AutoNDA by SimpleDocs

Related to Improved and Unimproved Rates

  • Sleeping Room Rate(s) A. The Contractor shall provide sleeping rooms to the Attendees at the following rate during the Program:

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Project Name Register ASIC

  • Additional Acceptable Uses of Student Data Contractor is prohibited from using Student Data for any secondary use not described in this agreement except:

  • Points 9.6 The points to be assigned to the classification levels under this Agreement shall be: Award Classification Level Recommended Points C14 - C13 - C12 32 C11 64 C10 96 C9 12 additional points above C10 C8 24 additional points above C10 C7 36 additional points above C10 C6 48 additional points above C10 C5 60 additional points above C10 C4 Standards and points to be finalised C3 Standards and points to be finalised C2a Standards and points to be finalised C2b Standards and points to be finalised C1a Standards and points to be finalised C1b Standards and points to be finalised and in accordance with Table 2 in the National Metal and Engineering Competency Standards Implementation Guide. Mixed functions

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the (project name), shall be earmarked for purposes such as parking spaces and services including but not limited to electric sub-station, transformer, DG set rooms, underground water tanks, pump rooms, maintenance and service rooms, fire fighting pumps and equipment's etc. and other permitted uses as per sanctioned plans. The Allottee shall not be permitted to use the services areas and the basements in any manner whatsoever, other than those earmarked as parking spaces, and the same shall be reserved for use by the association of allottees formed by the Allottees for rendering maintenance services.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Selection of projects and financial parameters 4.1 Open calls and availability of funds (including number of calls, duration of calls, and estimated size):