Hydrogen Sulphide Sample Clauses

Hydrogen Sulphide. The gas will not contain hydrogen sulphide in concentration greater than 5 mg/m3.
AutoNDA by SimpleDocs
Hydrogen Sulphide. Tests to determine hydrogen sulphide content shall be made whenever necessary, but not oftener than two (2) times during any calendar year, to determine whether the gas meets the requirements of Article VII, Section 1 (d) hereof. Such test shall be made at the expense of the Buyer. Seller shall have the right to witness and verify all tests.
Hydrogen Sulphide. Product shall not contain more than twenty (20) parts per million, by weight, of hydrogen sulphide.
Hydrogen Sulphide. H2S shall be continuously monitored by automatic instruments complying with ASTM D4084 (Lead acetate reaction rate method). e, f & g) Oxygen and Total Inerts (N2+CO2+Ar) N2, O2, Ar & CO2 shall be continuously measured by a GC with a lower detection limit not greater 0.005 % mole, using Helium as a carrier and a suitable column to split N2 and O2. The limiting value for Oxygen in Table 1 is required during normal operations. Higher values are allowed during commissioning of new pipelines.
Hydrogen Sulphide. H2S shall be continuously monitored by automatic instruments complying with ASTM D4084 (Lead acetate reaction rate method). e, f & g) Oxygen and Total Inerts (N2+CO2+Ar) N2, O2, Ar & CO2 shall be continuously measured by a GC with a lower detection limit not greater 0.005 % mole, using Helium as a carrier and a suitable column to split N2 and O2. The limiting value for Oxygen in Table 1 is required during normal operations. Higher values are allowed during commissioning of new pipelines. Such values and durations of irregularity shall be agreed upon by all parties before commissioning.
Hydrogen Sulphide. The gas will not contain hydrogen sulphide in concentration greater than 10 milligrams per cubic metre (10mg/m3). Test method: ASTM D 2725 Hydrogen sulphide content by methylene blue method.
Hydrogen Sulphide. The Gas shall not contain more than four (4) parts per million of hydrogen sulphide per hundred (100) cubic feet as determined by a method generally acceptable for use in the gas industry.
AutoNDA by SimpleDocs
Hydrogen Sulphide. The level of hydrogen sulphide in the [ ] shall not [ ]

Related to Hydrogen Sulphide

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Raw Materials Lonza shall procure all required Raw Materials as well as consumables other than those Raw Materials that are Customer Materials. Customer shall be responsible for payment for all consumables and Raw Materials ordered or irrevocably committed to be procured by Lonza hereunder. Upon cancellation of any Batch or termination of the Agreement, all unused Raw Materials shall be paid for by Customer within [***] days of invoice and at Customer’s option will either be (a) held by Lonza for future use for the production of Product, (b) delivered to Customer, or (c) disposed of by Lonza.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Speed The relative importance we attach is “high”.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

Time is Money Join Law Insider Premium to draft better contracts faster.