HISTORICAL AVALANCHES Sample Clauses

HISTORICAL AVALANCHES. The largest known ice fall the Alps happened on 11 September 1895 in the Alps in Switzerland, where the part of a glacier (five million m3) slipped off from the summit area of Altels and fell alpine pasture killing six people and 158 cows (Fig.3.1) 1896, Xxxxxxxxxxxxx Both authors have attempted to analyse the possible causes of this detachment. The prominent curve-shaped fracture line at the head of the niche left by the avalanche indicates failure under tensile stresses. Basal and shear adhesion and shear resistance at lateral abutments were the stabilizing forces. The gravitational pull and the sum of the retaining forces critical equilibrium from which the spontaneous release of the avalanche of the retaining forces failed. Probably this by warming of a frontal zone frozen to the bedrock. As a consequence, the extent of this zone became reduced and the the still frozen parts increased up to the shear strength of ice. Very warm in the preceding the ice support this hypothesis. More recently, on 30 August a major portion of the terminus of Allalingletscher (Valais, Switzerland) detached unexpectedly, slid down a rock slope of some over a vertical distance of 400 m and for further 400 m across the flat bottom of the valley, claiming 88 victims at the construction site (Fig.3.2). The volume of the ice avalanche was estimated at 0.5- 1 Subsequent glaciological investigations showed that the ice avalanche a of enhanced motion as a result of intensive bed-slip of an even larger mass that which broke off. It could be inferred that enhanced sliding on the rock occured already some 2-3 weeks prior to the sudden slump of the avalanche. It be that such active phases with enhanced sliding motion took place quite regularly of one to three years, usually in late summer or in fall, but always ending at of without any significant ice fall occurence. Similar movement be obseived on many other steep glacier tongues. This active phase was a necessary bur riot condition for the lower part of the tongue to slide off. convex bed topography and an unfortunate mass distribution, combined with the active phase, role that catastrophe (Xxxxxxxxxxxxx 1981, Xxxxxxxxxxxxx and Xxxxxx 1978). - - The road was blocked over a distance of 20 m and the air pressure injured three persons and knocked down some hikers (Xxxxxxxx and Funk 1998). The Gutzgletscher, a so-called hanging glacier, is situated on a moderately inclined bed in the very steep north-west face of Wetterhorn mountain and e...
AutoNDA by SimpleDocs

Related to HISTORICAL AVALANCHES

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • DEMONSTRATIONS/SAMPLES 9.1 Bidders shall demonstrate the exact item(s) proposed within seven (7) calendar days from receipt of such request from the Owners.

  • Certified and Minority Business Enterprises Reports Upon Customer request, the Contractor shall report to the requesting Customer the Contractor’s spend with certified and other minority business enterprises in the provision of commodities or services related to the Customer’s orders. These reports shall include the period covered, the name, minority code, and Federal Employer Identification Number of each minority business utilized during the period; commodities and services provided by the minority business enterprise, and the amount paid to each minority business enterprise on behalf of the Customer.

  • Therapist Availability Therapist’s office is equipped with a confidential voice mail system that allows Patient to leave a message at any time. Therapist will make every effort to return calls within 24 hours (or by the next business day), but cannot guarantee the calls will be returned immediately. Therapist is unable to provide 24-hour crisis service. In the event that Patient is feeling unsafe or requires immediate medical or psychiatric assistance, he/she should call 911, or go to the nearest emergency room.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Target Audience The target audience for this policy includes, but is not limited to, all faculty, trainees/students, and other members of MD Anderson’s workforce, including Facilities Management (FM) Project Managers, FM Operations and Maintenance (O&M) Staff, Contractors, and Stakeholders who request a Scheduled Utility Outage for: • New construction. • Renovation. • Maintenance.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • NASPO ValuePoint Summary and Detailed Usage Reports In addition to other reports that may be required by this solicitation, the Contractor shall provide the following NASPO ValuePoint reports.

Time is Money Join Law Insider Premium to draft better contracts faster.