High-level IoT6 Architecture‌ Sample Clauses

High-level IoT6 Architecture‌. In deliverable D1.2 [47], a high level view of the initial IoT6 architecture is given (Figure 14). As the focus of the IoT6 project is on utilizing IPv6 in IoT systems and integration of heterogeneous application domains, the architecture is mainly dealing with the communication part and integration of business processes/applications. The main components of the initial high level IoT6 architecture are IoT devices (IP and non-IP based), local and wide area communication network and the server side services and applications. Mobile applications Web applications SaaS STIS IoT6 backend server IoT6 Wide Area Network IoT6 Local Area Network IP based devices Non-IP based legacy devices IoT6 core architecture Figure 14: Initial high-level IoT6 architecture The top-level mapping of the initial IoT6 architecture shown in Figure 14 to the IoT ARM functional model shown in Figure 3 is described in Table 1. IoT6 IoT ARM Mobile applications, web applications, etc. Application IoT6 backend server IoT business process management IoT6 wide and local area networks Communication Devices Device
AutoNDA by SimpleDocs
High-level IoT6 Architecture‌. ‌ In deliverable D1.2 “First version of IoT6 Architecture and SOA specifications” [47], a high level view of the initial IoT6 architecture is given (Figure 14). As the focus of the IoT6 project is on utilizing IPv6 in IoT systems and integration of heterogeneous application domains, the architecture is mainly dealing with the communication part and integration of business processes/applications. The main components of the initial high level IoT6 architecture are IoT devices (IP and non-IP based), local and wide area communication network and the server side services and applications. Mobile applications Web applications SaaS STIS IoT6 backend server IoT6 Wide Area Network IoT6 Local Area Network IP based devices Non-IP based legacy devices IoT6 core architecture Figure 14: Initial high-level IoT6 architecture The top-level mapping of the initial IoT6 architecture shown in Figure 14 to the IoT ARM functional model shown in Figure 3 is described in Table 1. IoT6 IoT ARM Mobile applications, Web applications, etc. Application IoT6 backend server IoT business process management IoT6 wide and local area networks Communication Devices Device

Related to High-level IoT6 Architecture‌

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • CLASS SIZE/STAFFING LEVELS The board will make every effort to limit FDK/Grade 1 split grades where feasible. APPENDIX A – RETIREMENT GRATUITIES

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central Xxxxxx Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Level II In the event the grievance is not resolved in Level I, the decision rendered may be appealed by the Union to the Superintendent of schools, provided such appeal is made in writing within (20) twenty days in person after receipt of the decision in Level I. If a grievance is properly appealed by the Union to the Superintendent, the Superintendent or designee shall set a time to meet regarding the grievance within fifteen days after receipt of the appeal. Within (20) twenty days after the meeting, the Superintendent or designee shall issue a decision in writing to the Union.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.