Haul Routes Sample Clauses

Haul Routes. The following roads are designated as haul/travel routes for the Property:
AutoNDA by SimpleDocs
Haul Routes. The haul route(s) for all construction-related trucks, three tons or more, entering or exiting the site, shall be approved by the Transportation Operations Manager.
Haul Routes. Operators shall only use roadways for haul routes that are identified on a City-approved traffic control plan.
Haul Routes. 4.13.1 The restoration of Haul Routes for the Project is subject to the approval of the Presidio Trust under the Presidio Trust Right of Entry Agreement, but as of the Proposal Submission Date the extent of the damage to the Haul Routes could not be fully established. In anticipation of the final inspection requirements, the Department has included a requirement in the Technical Requirements for all Haul Routes to be returned to the preexisting condition prior to commencement of Phase I Construction, as indicated in the Survey of Existing Conditions Prior to Phase I Work. The requirements established by the Department in consultation with the Presidio Trust shall prevail over the Technical Requirements to the extent there exist any irreconcilable differences.
Haul Routes. All trucks used for work contracted by the City utilizing asphalt from the asphalt plant located at 0000 Xxxxx Xxxx Xxxx Road may only enter North Xxxx Xxxx Road from the North using CR 54 G and only exit the site on North Xxxx Xxxx Road to the North to CR 54G.
Haul Routes. Hauling route shall be provided to the City’s Biosolids Coordinator for each destination. The City’s Biosolids Coordinator must approve all hauling routes. Contractor shall submit proposed haul routes and any proposed changes to these routes to the Biosolids Coordinator for approval at least two weeks prior to implementation. Haul routes shall avoid residential land uses and commercial and business districts to the extent possible. If the use of haul routes near residential, commercial or business land uses cannot be avoided, the use of these routes shall be restricted to daylight hours. Drivers shall not stop en route except for normal traffic requirements. Contractor will not be compensated for loads hauled on routes that deviate from the approved routes without prior approval.
Haul Routes. 1. Consult with the authority having jurisdiction, establish the public thoroughfares to be used for haul routes and site access.
AutoNDA by SimpleDocs
Haul Routes. A. Perform work on rights-of-way as necessary to construct and maintain any roads, bridges, or drainage structures required for establishment and use of haul routes for construction operations.
Haul Routes 

Related to Haul Routes

  • Bus Routes A regular home-to-school, school-to-home, or a regularly scheduled mid-day 47 route.

  • Routes All bus stops and bus routes will be mutually agreed upon prior to the start of the school year. Additional stops will not be added until approved by Boys & Girls Clubs and reviewed for safety and approved by the School Board’s Transportation Department. Route changes, if approved, will require seven (7) calendar days from the date of request to the date of implementation. Special needs transportation requests must be made a minimum of fourteen (14) days prior to the requested date of implementation.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

  • Sites Sites shall mean the locations set forth in the Contract Documentation.

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Travelling, Transport and Fares (a) An employee required and authorised to use their own motor vehicle in the course of their duties will be paid not less than the allowance set out in item 21 in Table 2.

  • Competent Authorities and Contact Points 1. Each Party shall provide each other Party with a description of its competent authorities and their division of responsibilities.

  • Sleeping Room Rate(s) A. The Contractor shall provide sleeping rooms to the Attendees at the following rate during the Program:

  • Porcupine Site Highway 11

Time is Money Join Law Insider Premium to draft better contracts faster.