Hall heating Sample Clauses

Hall heating. Each radiator has a thermostatic control. If too hot, turn down individual radiators using this control. Please return each radiator to setting 4 (IIII) before leaving the Hall. No unauthorised heating appliances are allowed on the Hall premises.
AutoNDA by SimpleDocs

Related to Hall heating

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • KITCHEN  Discard all leftover food in large trash receptacle in kitchen and empty any smaller trash receptacles if used into large trash can in kitchen.  Empty large trash bin into the dumpster, (if feasible). If not, please notify front desk.  Flatware is to be pre-soaked, washed in dishwasher, dried, returned to drawers and placed facing in the same direction.  Dishes, glassware, chopping boards, cooking utensils, pots/pans, baking sheets etc. should be washed in accordance with the instructions on the dish washing machine and returned DRY to dish carts and cupboards. Please check for lipstick/chap stick marks and clean those off accordingly before putting glasses/cups away.  Wipe down outside of dishwasher, empty dishwasher food trap into trash and wash out.  Counters and sinks wiped down with the water and bleach solution.  If used, please wipe inside and out microwave oven; wall/warming ovens, inside the refrigerator and refrigerator door.  Run garbage disposal in large double sink by dishwashing machine to clear food waste (Please do not put any food waste in small sinks).  Wipe out Alto-Shaam (Warming Ovens) and clean food trays if used.  Rinse out any Dish Tubs.  Empty any tubs of excess ice outside, if used.  Sweep floor of food debris.  Empty large trash bin into the dumpster (if feasible). If not please notify front desk. B BQ’s:  Make sure propane is turned off after use  Clean grill racks with wire brush and wipe up any spills /food debris from the BBQ  Leave outside to cool.  Please check with Front Desk regarding storage of cold and cleaned BBQ’s PATIO:  Return outdoor umbrellas and furniture to original positions.  Wipe down outdoor furniture if spills have occurred.  Dispose of trash/food waste and cigarette butts in trash receptacles. The following applies if any food and/or beverages have been served in these rooms: GREAT ROOM:  Wipe down tables with bleach /water solution. (Located under the sink in the kitchen next to the coffee maker).  If linens have been used or rented, please shake off any food debris in trash receptacles and place linens in mesh bags provided. Sorting by color or type is not necessary.  Notify front desk of any beverage spills as soon as they occur.  Empty any trash receptacles into large trash can in kitchen and then empty that into the dumpster (if feasible). If not please notify front desk.  Sweep/Vacuum carpet of any food debris. (These items are located in the cupboard next to Men’s restroom.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

Time is Money Join Law Insider Premium to draft better contracts faster.