Groundwater and Cleanup Data Flow Sample Clauses

Groundwater and Cleanup Data Flow. The Contractor shall be responsible for the entry or export of analytical and quality control results into the Electronic Deliverable FormatTM (EDF). The Contractor shall ensure that the records are complete and accurate and meet the most current formatting and business rules of the EDF. The Contractor shall include and appropriately report the applicable quality control samples required per batch or per project to establish and verify compliance with the applicable MQOs. The Contractor shall evaluate the results of the quality control samples and apply appropriate qualifications to results that do not meet the applicable MQOs. The Contractor shall apply qualifications to the records following the EDF formatting and business rules. The Contractor shall ensure result and/or batch comments include any applicable information about the result. The data flow for groundwater results is illustrated below. The data flow is that the Contractor submits the laboratory results to the Water Boards Project Manager for upload to the GeoTracker database via e-mail to Xxx.Xxxxxxx@xxxxxxxxxxx.xx.xxx. Project Lab Results Water Boards Manager GeoTracker
AutoNDA by SimpleDocs

Related to Groundwater and Cleanup Data Flow

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Environmental Health and Safety i. Environment, Health and Safety Performance. Seller acknowledges and accepts full and sole responsibility to maintain an environment, health and safety management system ("EMS") appropriate for its business throughout the performance of this Contract. Buyer expects that Seller’s EMS shall promote health and safety, environmental stewardship, and pollution prevention by appropriate source reduction strategies. Seller shall convey the requirement of this clause to its suppliers. Seller shall not deliver goods that contain asbestos mineral fibers.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • DISCOVERY OF HAZARDOUS MATERIALS If, during the performance of the Work, Contractor or Contractor’s subcontractor(s) encounter material believed to be asbestos, polychlorinated biphenyl (PCB), or any other identified or non-identified potentially hazardous material (which has not been rendered harmless and labeled as such), Contractor and Contractor’s subcontractor(s) shall immediately stop work in the area affected and report the condition, in writing, to District. The Work in the affected area shall not continue or be resumed except by written direction of District and by agreement by Contractor.

  • Operating Environment Subscriber is solely responsible for acquiring, installing, operating and maintaining the hardware, software and Internet Browser environment necessary to access the Site and use the Services. Information on operating environment requirements can be located on the Site.

  • Remediation The Charter School shall provide remediation in required cases pursuant to State Board of Education Rule 160-4-5-.01 and No Child Left Behind, subject to any amendment, waiver or reauthorization thereof

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • Environmental Health and Safety Performance Seller acknowledges and accepts full and sole responsibility to maintain an environment, health and safety management system ("EMS") appropriate for its business throughout the performance of this Contract. Buyer expects that Seller’s EMS will promote health and safety, environmental stewardship, and pollution prevention by appropriate source reduction strategies. Seller shall convey the requirement of this clause to its suppliers. Seller shall not deliver Goods that contain any asbestos mineral fibers.

Time is Money Join Law Insider Premium to draft better contracts faster.