Grey Water Sample Clauses

Grey Water. In compliance with New York State law, grey water cannot run onto the ground. All sites must have a dry well installed for grey water containment. The dry well must have sufficient holding and gravel capacity to prevent standing water at the dry well.
AutoNDA by SimpleDocs
Grey Water. The water from doing dishes, showering and brushing teeth is grey water. We can't have it on the ground because the chemicals seep into our well system and this is against New York state law. Please, no outdoor sinks or showers and dump water in the RV dump station by the main shower house.
Grey Water. Grey water disposal tanks will be positioned at the north end of the midway/food court outside the fencing.
Grey Water. System Discharge pump, grey water tank, hoses, switches, valves.

Related to Grey Water

  • Management Information Systems A. The CONTRACTOR shall maintain a process that collects, analyzes, integrates, and reports data. (42 C.F.R. § 438.242(a); Cal. Code Regs., tit. 9, § 1810.376.) This process shall provide information on areas including, but not limited to, utilization, claims, grievances, and appeals. (42 C.F.R. § 438.242(a).)

  • Management Information System The M&E Plan will describe the information system that will be used to collect data, store, process and deliver information to relevant stakeholders in such a way that the Program information collected and verified pursuant to the M&E Plan is at all times accessible and useful to those who wish to use it. The system development will take into consideration the requirement and data needs of the components of the Program, and will be aligned with existing MCC systems, other service providers, and ministries.

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • Natural Resources Protecting America’s great outdoors and natural resources.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Time Management Because of the nature of the duties performed by these supervisors, it is impracticable to apply provisions which prescribe normal work hours. However, it is normally expected that eighty (80) hours of work shall constitute a normal payroll period. It is recognized that these supervisors are responsible for managing and accounting for their own hours of work and that they may work hours in excess of the normal work day and/or payroll period and may make adjustments in hours of work in subsequent work days and/or payroll periods, provided such time management system does not result in overtime payment or guarantee hour-for-hour time off for extra hours worked.

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Waste Management 4.1 Has your company been issued an EPA Hazardous Waste Generator I.D. Number? Existing Tenants should describe any additional identification numbers issued since the previous certificate. Yes [ ] No [ ]

Time is Money Join Law Insider Premium to draft better contracts faster.