General; Testing Sample Clauses

General; Testing. In the case of a Permitted Inspection or the Final Inspection, the parties shall: (i) comply with all health and safety rules of which such party has been informed that have been established for personnel present on the construction site; and (ii) coordinate the inspections so that the inspections do not interfere with the performance of construction. City and Developer each shall have the right to accompany, and/or have its construction manager accompany, the inspecting party during any Permitted Inspection and/or the Final Inspection. Notwithstanding anything to the contrary set forth herein, to the extent City, in the exercise of its reasonable discretion, requires any sampling or testing (e.g., concrete testing) as part of a Permitted Inspection and/or Final Inspection: (i) the deadline for City’s issuance of a Non-Compliance Notice shall be deemed extended to five (5) business days following City’s receipt of a complete and final set of such test or sample results; and (ii) the applicable dates in the Construction Schedule shall likewise be extended.
AutoNDA by SimpleDocs
General; Testing. In the case of a Permitted Inspection or the Final Inspection, the parties shall: (i) comply with all health and safety rules of which such party has been informed that have been established for personnel present on the construction site; and
General; Testing. In the case of a Permitted Inspection or the Final Inspection, the parties shall: (i) comply with all health and safety rules of which such party has been informed that have been established for personnel present on the construction site; and (ii) coordinate the inspections so that the inspections do not interfere with the performance of construction. City and Developer each shall have the right to accompany, and/or have its construction manager accompany, the inspecting party during any Permitted Inspection and/or the Final Inspection. Notwithstanding anything to the contrary set forth herein, to the extent City, in the exercise of its reasonable discretion, requires any sampling or testing (e.g., concrete testing) as part of a Permitted Inspection and/or Final Inspection, the deadline for City’s issuance of a Non-Compliance Notice shall be deemed extended to five
General; Testing. In the case of Inspections, the parties shall: (i) comply with all health and safety rules of which such party has been informed that have been established for personnel present on the construction site; and (ii) coordinate the Inspections so that the Inspections do not interfere with the performance of construction. City and Company each shall have the right to accompany, and/or have its construction manager accompany, the Inspector during any Permitted Inspection and/or the Final Inspection. Notwithstanding anything to the contrary set forth herein, to the extent City, in the exercise of its reasonable discretion, requires any sampling or testing (e.g., soil bearing capacity testing, concrete testing, vibration monitoring) as part of a Permitted Inspection and/or Final Inspection: (i) the deadline for City’s issuance of a Non-Compliance Notice shall be deemed extended to five (5) business days following City’s receipt of a complete and final set of such test or sample results; and (ii) the Completion Date shall likewise be extended.
General; Testing. In the case of a Permitted Inspection or the Final Inspection, the Parties shall: (i) comply with all health and safety rules of which such party has been informed that have been established for personnel present on the construction site; and (ii) coordinate the inspections so that the inspections do not interfere with the performance of construction. City and Multi-Family Developer and/or Course Owner, as applicable, each shall have the right to accompany, and/or have its construction manager accompany, the inspecting Party during any Permitted Inspection and/or the Final Inspection. Notwithstanding anything to the contrary set forth herein, to the extent City, in the exercise of its reasonable discretion, requires any sampling or testing (e.g., concrete testing) as part of a Permitted Inspection and/or Final Inspection: (i) the deadline for City’s issuance of a Non-Compliance Notice shall be deemed extended to five (5) business days following City’s receipt of a complete and final set of such test or sample results; and (ii) the applicable dates in the Construction Schedule shall likewise be extended.
General; Testing. A. Hours of training in one grade does not count for hours toward a higher grade. For example, a grade 7 (Maintenance Technician I) employee needs 28 hours of classroom instruction and 60 hours of practical experience. Once s/he obtains a grade 8 (Maintenance Technician II) position, s/he needs to start to accrue necessary hours of classroom instruction and practice experience to qualify for a grade 9 (Maintenance Technician III) position.
General; Testing. 2.1.1. In-process testing and release testing of Starting Materials, Raw Materials and Product will be the responsibility of Ash Sxxxxxx in accordance with the test methods agreed to by “Company”. Ash Sxxxxxx will transfer the methods and write test methods and assay qualification protocols that will be approved by the “Company” Quality Representative.
AutoNDA by SimpleDocs
General; Testing. The Drug Substance will be tested by CBSI in accordance with the Validated and cross Validated test methods which will be written by CBSI and approved by Centocor Quality Product Development and Operation representatives in accordance with the provisions in Attachment 2. ------------
General; Testing. REQUIREMENTS With respect to each Plan Year, an Employer's Plan which offers a Code Section 401(k) cash or deferred arrangement and any contributions made thereunder must satisfy the Average Deferral Percentage Test ("ADP Test") and, if applicable, the Average Contribution Percentage Test ("ACP Test"). Under each of these tests, the Average Deferral Percentage (ADP) and the Average Contribution Percentage (ACP) for Highly Compensated Employees may not exceed the ADP and ACP for Non-Highly Compensated Employees by more than the amount permitted by application of the basic limit or the alternative limit. These limits are described at paragraphs 11.2 and 11.6 herein. If the ADP or ACP for Highly Compensated Employees exceeds the basic limit or the alternative limit, the applicable average for Highly Compensated Employees either must be reduced to the maximum permitted under the most liberal limit or the average of the Non-Highly Compensated Employees is increased. The reduction in the average is determined in accordance with paragraph 11.4 herein. In lieu of reducing the applicable average for the Highly Compensated Employees, the Employer may elect to make an additional Qualified Non-Elective Contribution (QNEC) and/or a Qualified Matching Contribution (QMAC) for Non-Highly Compensated Employees to increase their Average Deferral Percentage and/or Average Contribution Percentage to the point where the Plan satisfies the ADP and/or the ACP Test. These qualified contributions are described at paragraph 11.5 herein. If the Plan can only satisfy the ADP Test and the ACP Test by application of the alternative limit, the Plan must apply the multiple use test as described at paragraph 11.7(b) hereof. If the Plan fails to satisfy the multiple use test, the Employer must either make correcting distributions to affected Highly Compensated Employees or make QNEC and/or QMAC contributions for Non-Highly Compensated Employees to the point where the Plan satisfies the multiple use test.

Related to General; Testing

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Financial testing The financial covenants set out in Clause 20.2 (Financial condition) shall be tested by reference to each of the financial statements and/or each Compliance Certificate delivered pursuant to Clause 19.2 (Compliance Certificate).

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Product Testing Upon request, Customer shall provide Operator a laboratory report for each Product delivery by Customer or Customer’s supplier. Operator will not be obligated to receive Contaminated Product for throughput across the Berths, nor will Operator be obligated to accept Product that fails to meet the quality specifications set forth in the arrival notice.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.