General Conditions Work. General Conditions Work (“GC Work”) shall mean (i) that portion of the Work required to support construction operations that is not included within overhead or general expense but is called out as GC Work in Exhibit C, and
AutoNDA by SimpleDocs
General Conditions Work. Construction Manager shall furnish and supervise the General Conditions Work. Construction Manager shall be responsible for, and shall pay without Owner’s reimbursement, all costs and expenses, including Costs of the Work, arising from the General Conditions Work that are in excess of the General Conditions Work Cost Limit.‌
General Conditions Work. Design-Builder shall furnish and supervise the General Conditions Work. Design-Builder shall be responsible for, and shall pay without Owner’s reimbursement, all costs and expenses, including Costs of the Work, arising from the General Conditions Work that are in excess of the General Conditions Work Cost Limit.
General Conditions Work. 4.1.1.3 non-specialty Work valued in the aggregate for the Project at less than $200,000 if the DB obtains the Contracting Authority’s written approval before the commencement of that Work;
General Conditions Work. Refer to Exhibit H for a complete list of approved general condition items. These approved items shall be reflected in the General Conditions lump sum cost shown as a line item in the Guaranteed Maximum Price Proposal and the schedule of values/cost breakdown. Items not shown on Exhibit H will not be accepted as a general condition cost and will be part of the Pre- construction Phase Fee, Construction Phase Fee or Cost of Work.
General Conditions Work. XXXX’x on-site management, administrative personnel, insurance, Bonds, equipment, utilities, and incidental work, including field labor and materials. General Conditions includes, but is not limited to: all supervision and project management, including superintendent, assistant superintendent; permits; mobilization; de-mobilization; field engineers and helpers, professional surveyor; field office; field office furnishings; office supplies; field office maintenance and repair; copiers and supplies; storage; communication devices (telephone, radio, etc.); project signs; construction fence – install/remove/maintain; access construction; general clean-up; finish areas clean-up; dumpsters; temporary water service; temporary electrical service; temporary lighting; temporary telephone; temporary weather protection; temporary fire protection; equipment start and testing; monthly ice and cups, monthly toilets; monthly water; and quality control.
General Conditions Work. If requested by the Owner in writing, the Construction Manager will perform all or a portion of the General Conditions Work for the cost of that Work.
AutoNDA by SimpleDocs
General Conditions Work. DB’s on-site management, administrative personnel, insurance, Bonds, equipment, utilities, and incidental work, including field labor and materials. General Conditions includes, but is not limited to: all supervision and project management, including superintendent, assistant superintendent; permits; mobilization; de-mobilization; field engineers and helpers, professional surveyor; field office; field office furnishings; office supplies; field office maintenance and repair; copiers and supplies; storage; communication devices (telephone, radio, etc.); project signs; construction fence – install/remove/maintain; access construction; general clean-up; finish areas clean-up; dumpsters; temporary water service; temporary electrical service; temporary lighting; temporary telephone; temporary weather protection; temporary fire protection; equipment start and testing; monthly ice and cups, monthly toilets; monthly water; and quality control.
General Conditions Work. General Conditions Work (“GC Work”) shall mean:
General Conditions Work. “ General Conditions Work” or “GC Work” means that portion of the Work required to support construction operations at the job site that is not included within overhead or general expense, and not otherwise included in or excluded from the Cost of the Work in Article 8 or Article 9, including the cost of expenses of Contractor’s offices at the job site (e.g. job trailer), telephone calls, communication devices, computers, software, vehicle cost, postage and parcel delivery charges, telephone service at the Project site and reasonable xxxxx cash expenses of the CM/GC’s office at the Project site, which are solely for the benefit of the Work and wages or salary of personnel at or below the level of Senior Project Manager stationed at the Project site. Salaries and other compensation of the CM/GC’s personnel stationed at the CM/GC’s principal offices or offices other than the CM/GC’s office at the Project site and the expenses of the CM/GC’s principal offices and offices other than the Project site office are not included in General Conditions Work and are governed by Article 9, Sections 9.1.1, 9.1.2, and Article 8, Sections 8.2.2 and 8.2.3.