Fume Hoods Sample Clauses

Fume Hoods. Fume Hoods will be 6’ wide, bench top hoods with a combination sash. Hoods will be factory pre-piped and pre-wired for Vacuum, Compressed Air and normal power with all services on each fume hood post. Hoods shall be UL 1805 listed and provide a minimum of 100 FPM exhaust with the sash in any position. Hoods will also be provided with self-closing acid and flammable storage cabinet bases.
AutoNDA by SimpleDocs
Fume Hoods. The parties hereto acknowledge that there are 37 fume hoods located in the Sublease Space. Upon the expiration or termination of the Term (as may be extended in accordance with the terms hereof), Subtenant shall provide to Sublandlord certifications of all such fume hoods showing that such fume hoods are still certified by the applicable regulatory authority and are in the same condition as existed on the Commencement Date, reasonable wear and tear and loss by casualty excepted. If necessary, Subtenant will repair the fume hoods so that such certifications may be made.
Fume Hoods. Notwithstanding Paragraph 2.4(a) of the Lease, Tenant may remove the two (2) fume hoods from laboratory room number 157 in connection with Tenant’s completion of the Tenant Improvements, provided that, upon Landlord’s request in connection with Tenant’s surrender of the Premises, Tenant shall re-install those fume hoods which Landlord requests Tenant to re-install.
Fume Hoods. Fume Hoods shall be 6’ wide, bench top hoods with a combination sash. Hoods shall be factory pre-piped and pre-wired for Vacuum, Compressed Air and a normal power duplex at each post. Hoods shall be provided with (1) acid and (1) self-closing flammable storage cabinet bases. SCHEDULE 1 GENESIS 1900 ALAMEDA 8 [BigHat Biosciences, Inc.] Execution Original SCHEDULE 2 CONSTRUCTION BACK-UP ITEMS • General Contractor G702/703 - signed • Subcontractor G702/703 or equivalent for each sub (Copies of signed & notarized) • Copies of executed Change Orders or executed Schedule of Valves (“SOV”) change authorizations (pre GMP) • Unconditional Lien Releases from GC and Subs for prior payment (Civil Code § 8134) • Unconditional Lien Releases from the General Contractor for payment request (Civil Code § 8134) • Conditional Lien Releases from GC and Subs for payment request (Civil Code § 8132) • Releases from suppliers of materials or equipment of any purchase money security interests • Stored Material Inventory with appropriate backup (bills of sale, evidence of insurance {with Owner as Certificate Holder and standard additional insureds}, confirmation of location, Affidavit, etc.) • Change Order Log (need to include all pending change orders and status tracking) • Clarification of self-performed vs. subcontracted work • Job Cost Activity or similar tracking of GC general conditions costsList of all subcontractorsList of contracts/subcontracts entered into since the last request • Changes to SOV Values must be authorized by Owner either through an executed Change Order or an executed letter of authorization (pre GMP). Payapps submitted with unauthorized SOV changes on G703’s will not be accepted. The General Contractor shall provide all items to Landlord’s Representative directly. SCHEDULE 2 GENESIS 1900 ALAMEDA 1 [BigHat Biosciences, Inc.] Execution Original SCHEDULE 3 TENANT’S INITIAL SPACE PLAN SCHEDULE 3 GENESIS 1900 ALAMEDA 1 [BigHat Biosciences, Inc.] Execution Original EXHIBIT C CONFIRMATION OF LEASE TERMS/AMENDMENT TO LEASE This CONFIRMATION OF LEASE TERMS/AMENDMENT TO LEASE (“Confirmation/Amendment”) is made and entered into effective as of _________________, 20__, by and between BP3-SF6 1900 ADLP LLC, a Delaware limited liability company (“Landlord”) and BIGHAT BIOSCIENCES, INC., a Delaware corporation (“Tenant”).
Fume Hoods. During the Term of the Lease and subject to the terms and conditions set forth below, Tenant shall have the right to continue to use the Fume Hoods in the Premises as of the Date of Lease. Tenant may use the Fume Hoods only within the Premises. Such right is personal to Bolt Biotherapeutics, Inc. and shall not be transferable or assignable (voluntarily or involuntarily) to any person or entity except a Permitted Transferee that satisfies the terms and conditions of Section 10.01(e) of the Lease or to an assignee of the entire Lease that complies in all respects with the Lease or a subtenant that subleases at least twenty-five percent (25%) of Rentable Area of the Premises for the sublease term as part of a bona fide sublease that complies in all respects with the Lease. Landlord shall have no obligation to repair, recondition, assemble or install the Fume Hoods, or to pay for any of the foregoing. During the Lease Term, the Fume Hoods shall remain Landlord’s property, but Tenant shall have full responsibility for the Fume Hoods, as if Tenant owned such Fume Hoods, including maintenance, repair and insurance. On the Termination Date, the Fume Hoods shall be returned to Landlord in the same condition in which they were acquired, except for normal wear and casualty damage (subject to Tenant’s insurance obligations).
Fume Hoods. On or before the date hereof, Sublandlord shall deliver to ---------- Subtenant certifications for all fume hoods located in the Sublease Space certified by the applicable regulatory authority. The parties hereto acknowledge that there are 37 fume hoods located in the Sublease Space. Upon the expiration or termination of the Term, Subtenant shall provide to Sublandlord certifications of all such fume hoods showing that such fume hoods are still certified by the applicable regulatory authority and are in the same condition as existed on the date of the Sublease, reasonable wear and tear and loss by casualty excepted. If necessary, Subtenant will repair the fume hoods so that such certifications may be made.

Related to Fume Hoods

  • Control Areas Tenant shall be allowed to utilize up to its pro rata share of the Hazardous Materials inventory within any control area or zone (located within the Premises), as designated by the applicable building code, for chemical use or storage. As used in the preceding sentence, Tenant’s pro rata share of any control areas or zones located within the Premises shall be determined based on the rentable square footage that Tenant leases within the applicable control area or zone. For purposes of example only, if a control area or zone contains 10,000 rentable square feet and 2,000 rentable square feet of a tenant’s premises are located within such control area or zone (while such premises as a whole contains 5,000 rentable square feet), the applicable tenant’s pro rata share of such control area would be 20%.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Electrical Provide drawings for the following systems:

  • HEATING, VENTILATING AND AIR CONDITIONING General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Emergency Generator Although Landlord is the owner of emergency generator and related automatic transfer switches serving the Building and the 901 Building (collectively, the “Emergency Generator”), prior to the date of this First Amendment, Tenant, as the sole tenant of the Building and the 901 Building, has been operating and maintaining the Emergency Generator. Tenant shall, on the date that is 1 day after the mutual execution and delivery of this First Amendment by the parties (“EG Transfer Date”), (x) deliver the Emergency Generator to Landlord in good working order with a full tank of diesel (y) assign to, transfer and deliver to Landlord all governmental permits and licenses (to the extent such permits and licenses are assignable), if any, warranties (to the extent assignable), operating and maintenance manuals, records and other documents concerning the Emergency Generator, and (y) terminate any service, maintenance or other contracts maintained by Tenant with respect to the Emergency Generator. Tenant has not been obligated to maintain a wastewater permit in connection with the Emergency Generator. With respect to any permit required for the Emergency Generator, Landlord acknowledges and agrees that Tenant has been in the process of obtaining a generator permit in connection with a Tenant permitting process underway with the Bay Area Air Quality Management District (“BAAQMD”) for the 901 Building, that Tenant will remove the generator from its permit application with BAAQMD, and that Landlord will need to obtain a generator permit from BAAQMD in its own name. To the best of Tenant’s knowledge, Tenant does not have any other permits in connection with the Emergency Generator. To the extent Tenant has current contracts with any vendors for the Emergency Generator, Tenant and Landlord shall reasonably cooperate to assign or terminate such contracts in the manner set forth in Section 14 above regarding utilities. To the extent it is not possible for Tenant to remove the request for a generator permit from its BAAQMD application or to assign or terminate any service maintenance or other contracts within 1 day after the mutual execution and delivery of this First Amendment, Tenant shall not be in default hereunder if Tenant promptly commences efforts to do so and diligently performs until such actions have been completed within a reasonable period after such date. Landlord shall, within 5 days of the EG Transfer Date, as part of Expenses, conduct such testing of the Emergency Generator required, in Landlord’s sole and absolute discretion, to determine whether the Emergency Generator is, in fact, in good working order. If such testing discloses that the Emergency Generator is not in good working order, Landlord shall have the right, at Tenant’s sole cost and expense, to perform any maintenance and/or repairs required to put the Emergency Generator in good working order. Following the EG Transfer Date, Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the current capacity of the Emergency Generator and Tenant shall be entitled to Tenant’s share of the capacity thereof available for use by all tenants of the Building and the 901 Building, collectively, in accordance with the rentable area of the Premises and the 901 Building and the collective rentable areas of the Building and the 901 Building occupied by such other tenants, (ii) to contract with a third party to maintain the emergency generators (“Emergency Generator Servicer”) as per the manufacturer’s standard maintenance guidelines, and (iii) to obtain and maintain licenses for the emergency generators as required by applicable law. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the Emergency Generator Servicer or any other third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Landlord shall provide to Tenant copies of any reports received by Landlord from the Emergency Generator Servicer regarding its maintenance and repairs of the emergency generators; provided, however, that in no event shall Landlord’s failure to deliver such reports constitute a default by Landlord under the Lease. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed. Landlord shall provide Tenant with not less than five (5) business days’ notice of the scheduled disruption in the operation of the emergency generators. In the case of an emergency, Landlord shall provide Tenant with notice of any emergency disruption as soon as reasonably possible after Landlord becomes aware of the need for such emergency disruption.

  • Plumbing fixtures and appliances shall be used only for the purposes for which designed, and no sweepings, rubbish, rags or other unsuitable material shall be thrown or deposited therein. Damage resulting to any such fixtures or appliances from misuse by a tenant or its agents, employees or invitees, shall be paid by such tenant.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

Time is Money Join Law Insider Premium to draft better contracts faster.