Fugitive Dust Sample Clauses

Fugitive Dust. A regular watering program shall be initiated to adequately control the amount of fugitive dust in accordance with applicable AQMD rules. Exposed soil surfaces shall be sprayed with water at least daily and as needed to mitigate dust (see also Article 36.08-c, Protection of Facilities).
AutoNDA by SimpleDocs
Fugitive Dust. ‌ The Certificate Holder shall implement appropriate mitigation measures to control fugitive dust from roads and construction activities. The Certificate Holder shall use water or a water-based environmentally safe dust palliative such as lignin, for dust control on unpaved roads during Project construction.
Fugitive Dust. All practicable methods (including watering, re-vegetation, synthetic cover, and/or chemical stabilization) shall be used to minimize fugitive particulates. The contractor will be responsible for developing and implementing a fugitive dust control plan. The plan and completed Air Pollutant Emission Notice (APEN) application shall be submitted and approved by the Colorado Department of Public Health and Environment’s Air Pollution Control Division prior to construction- related activities, if required by state law. Northern Water and/or NISP Enterprise shall adhere to Section 8.11 of the Land Use Code related to Air Quality Standards.
Fugitive Dust. Developer shall be responsible for addressing Significant Fugitive Dust created by the Developer Parties. When requested by the County, Developer shall reasonably address or minimize Significant Fugitive Dust using water, calcium chloride, or appropriate other commercially available reasonable means in Developer’s reasonable discretion.
Fugitive Dust. Fugitive Dust" is defined as that dust which drifts beyond the lot line of property on which dust is raised (for example, beyond the ROW line). Turtle Creek shall be responsible for addressing Fugitive Dust caused by Turtle Creek and its contractors. Fugitive Dust must be addressed when it creates a nuisance. A nuisance must bother a person or party and as such, dust drifting onto a vacant lot, pasture or field may not be a nuisance. When requested by the County, Turtle Creek shall reasonably address or minimize Fugitive Dust using water, calcium chloride, or other commercially available reasonable means; whichever is deemed most appropriate.
Fugitive Dust. Operator must submit to the City a dust mitigation plan. Silica dust must be contained to the maximum extent reasonably practicable during the hydraulic fracturing process. Dust associated with on-site activities and traffic on access roads shall be minimized throughout construction, drilling and operational activities such that there are no visible dust emissions from access roads or the Well Sites to the extent practical given wind conditions. No untreated produced water or other process fluids shall be used for dust suppression. The Operator will avoid creating dust or dust suppression activities within three hundred (300) feet of the ordinary high water xxxx of any waterbody, unless the dust suppressant is water. Material Safety Data Sheets (MSDS) for any chemical-based dust suppressant, other than magnesium chloride, shall be submitted to the City prior to use.
Fugitive Dust. The Permittee shall take all reasonable precautions to minimize the emissions of fugitive dust in accordance with §300 of Rule 310 and Rule 310.01. [Rule 310, §300]
AutoNDA by SimpleDocs
Fugitive Dust. You agree to comply with the Fugitive Dust Rules established by your Local Air Pollution Control District and take “every reasonable precaution to minimize emissions.” Check local rules at: xxxx://xxx.xxx.xx.xxx/drdb/drdb.htm.

Related to Fugitive Dust

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Video Display Terminals ‌ The Employer shall ensure that any new office equipment or facility required for use in conjunction with VDTs shall meet the standards recommended by the Workers' Compensation Board.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Teaching Loads 1. The District will attempt to maintain balanced class sizes within buildings at all levels.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to Reconex.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!