Frontage road Sample Clauses

Frontage road. The commissioner for and on behalf of the state may enter into agreements with municipalities for the construction, improvement, and maintenance of trunk highways within the limits of said municipalities, including but not limited to agreements for the construction and maintenance of frontage roads upon and along trunk highways within the limits of said municipalities. Such frontage roads may be constructed along the main-traveled lanes of the trunk highway, or they may be constructed a reasonable distance out from the limits of the right-of-way acquired for the main-traveled lanes if in the considered judgment of the commissioner such location is necessary to eliminate unreasonable circuity of local travel or to provide access to properties otherwise denied access to public highways by the establishment and construction of the trunk highway. Such frontage roads shall connect, at least at one terminal, either with the main lanes of the trunk highway or with another public highway. The municipalities are authorized to enter into such agreement with the commissioner for the performance and responsibility of the work upon such terms as may be agreed upon.
AutoNDA by SimpleDocs
Frontage road. The Owner/Developer shall design and construct two (2) lanes (2-way) of frontage road from the eastern boundary of the MPUD/DRI to Meadow Pointe Boulevard to allow access to the district park site from Meadow Pointe Boulevard. The frontage road shall be located within the right-of-way for S.R. 56 for that portion of the common boundary between the district park site and the right-of-way for S.R. 56, unless the County Parks and Recreation Department agrees to allow the frontage road within the district park land. The frontage road shall be designed and constructed as a reverse frontage road outside of the S.R. 56 right-of-way as it approaches Meadow Pointe Boulevard in accordance with FDOT and County access management requirements, and the reverse frontage road portion of the road shall be located on the retail site at the northeast corner of Meadow Pointe Boulevard and S.R. 56 (the “Retail Parcel”). The portion of the frontage road located within the right-of-way for S.R. 56 shall be designed in accordance with roadway sections which are mutually agreeable to the Developer, FDOT and the County. Any portion of the frontage road which is located outside of the right-of-way for S.R. 56 shall be designed and constructed to include a minimum 24-foot wide paved section with two (2) 12-foot wide (2-way) travel lanes. Such design and construction shall be completed or bonded by the Owner/Developer prior to or concurrent with the issuance of the first building permit within the Retail Parcel in Xxxxxx Chapel Lakes DRI or in the Wyndfields MPUD adjacent to the east end of the district park site and S.R. 56, or completed prior to December 31, 2013, whichever occurs sooner. If a roadway conveyance or the District Park Conveyance creates a strip of land between the proposed access roads and the District Park Site, the Applicant/Developer shall be required to adjust or provide additional conveyances as requested by, and at no cost to the County.

Related to Frontage road

  • Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Front 1.2)Back; 1.3)Left; 1.4)Right; 1.5)Top; 1.6)Bottom; 1.7)Perspective 1.1 1.2 1.3 1.4 1.5 1.6

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Data Storage Where required by applicable law, Student Data shall be stored within the United States. Upon request of the LEA, Provider will provide a list of the locations where Student Data is stored.

  • -wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.

  • EMBANKMENT WIDENING The minimum embankment widening is:  2 feet for embankment heights at centerline of 2 to 6 feet.  4 feet for embankment heights at centerline of greater than 6 feet. Purchaser shall apply embankment widening equally to both sides of the road to achieve the required width.

  • Route As set forth in 47 C.F.R. § 51.319(e), a “Route” is a transmission path between one of Verizon's Wire Centers or switches and another of Verizon's Wire Centers or switches. A route between two points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) may pass through one or more intermediate Wire Centers or switches (e.g., Wire Center or switch “X”). Transmission paths between identical end points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) are the same “route,” irrespective of whether they pass through the same intermediate Wire Centers or switches, if any.

  • Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term.

Time is Money Join Law Insider Premium to draft better contracts faster.