Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.
Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48 See Figure 1 for required compliance Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope
Front 1.2)Back; 1.3)Left; 1.4)Right; 1.5)Top; 1.6)Bottom; 1.7)Perspective 1.1 1.2 1.3 1.4 1.5 1.6
Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.
Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.
Data Storage Where required by applicable law, Student Data shall be stored within the United States. Upon request of the LEA, Provider will provide a list of the locations where Student Data is stored.
-wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.
EMBANKMENT WIDENING The minimum embankment widening is: 2 feet for embankment heights at centerline of 2 to 6 feet. 4 feet for embankment heights at centerline of greater than 6 feet. Purchaser shall apply embankment widening equally to both sides of the road to achieve the required width.
Route As set forth in 47 C.F.R. § 51.319(e), a “Route” is a transmission path between one of Verizon's Wire Centers or switches and another of Verizon's Wire Centers or switches. A route between two points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) may pass through one or more intermediate Wire Centers or switches (e.g., Wire Center or switch “X”). Transmission paths between identical end points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) are the same “route,” irrespective of whether they pass through the same intermediate Wire Centers or switches, if any.
Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term.