Front End Sample Clauses

Front End. Software that makes a modification of a target computer language dialect and embedded calls to other packages so that the language may be converted into Peritus Intermediate Language and subsequently processed through the Peritus technologies.
AutoNDA by SimpleDocs
Front End. Involves the transformation of the design concepts into a functional user interface through programming.
Front End grid inverter modeling and control The three-phase inverter is modelled as an ideal voltage source. For its modelling and control purposes, it is preferable not to consider time varying magnitudes, so ac voltages and currents are not treated as seen from a stationary frame, but from a rotating reference with grid frequency. This way, such magnitudes are seen as constant in time. To do so, the qd0 Park's transformation is utilized [7]. In short, Xxxx’s transformation permit to represent the three sinusoidal waveforms for the current and voltage of a three phase system, as mainly two vectors in the Gaussian plane at 90º. These two vectors are stationary, and from their magnitude and phase, all information to the corresponding sinusoidal waveforms can be derived. Thus, the application of this transformation reduces the computational effort for the model, since not dealing with sinusoidal waveforms anymore. The result of such exercise can be consulted in [1]. Adopting such mathematics, the tuning of the control system of the front-end grid inverter can be easily solved. The aim of such controller, as can be noted in Figure 6, is to manage the reactive power exchanged with the main grid and to maintain constant the dc-link voltage for the proper operation of the dc-dc modules. This controller is solved through a set of two PI control loops in cascade. The inner control loop manages the instantaneous currents exchanged with the grid expressed in the Park's frame, so in the qd0 reference. In turn, the active current set-point is provided by an outer control loop keeping the voltage as constant. For the sake of completeness, the expressions for the calculation of the parameters of the above explained PI control loops are introduced in the following. For the current control loops, it reads, iqd pqd = =
Front End. FEE The Parent shall pay to the Arrangers the fees specified in the letter of even date herewith from the Arrangers to the Parent at the times, and in the amounts, specified in such letter.
Front End. The entire front end of the Trolley shall be sealed to prevent debris accumulation behind the dash and to prevent the operator's feet from kicking or fouling wiring and other equipment. The front end shall be free of protrusions that are hazardous to passengers standing or walking in the front of the Trolley during rapid decelerations. Paneling across the front and any trim around the operator's compartment shall be formed metal, fiberglass or plastic material. Formed metal dash panels shall be painted and finished to the quality described in Section
Front End. Fee for the Short Term Working Capital Facility under the Credit Facilities Agreement and the Overdraft Facility Within seven (7) days from the Effective Date of the Credit Facilities Agreement, the Borrower paid the front end fee for the Short Term Working Capital Facility under the Credit Facilities Agreement to IFCT for the amount of Baht 350,000 (Three Hundred Fifty Thousand Baht) and paid the front end fee for the Overdraft Facility to Bank of Ayudhya for the amount of Baht 50,000 (Fifty Thousand Baht).
AutoNDA by SimpleDocs
Front End a. Siemens will furnish and install (1) new Front end at TCC main campus central plant and
Front End 

Related to Front End

  • DS3 Loop DS3 Loop is a two-point digital transmission path which provides for simultaneous two-way transmission of serial, bipolar, return-to-zero isochronous digital electrical signals at a transmission rate of 44.736 megabits per second (Mbps) that is dedicated to the use of the ordering CLEC in its provisioning of local exchange and associated exchange access services. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated DS3 transport is a metallic-based electrical interface.

  • Zone File Access Agreement Registry Operator will enter into an agreement with any Internet user, which will allow such user to access an Internet host server or servers designated by Registry Operator and download zone file data. The agreement will be standardized, facilitated and administered by a Centralized Zone Data Access Provider, which may be ICANN or an ICANN designee (the “CZDA Provider”). Registry Operator (optionally through the CZDA Provider) will provide access to zone file data per Section 2.1.3 of this Specification and do so using the file format described in Section 2.1.4 of this Specification. Notwithstanding the foregoing, (a) the CZDA Provider may reject the request for access of any user that does not satisfy the credentialing requirements in Section 2.1.2 below; (b) Registry Operator may reject the request for access of any user that does not provide correct or legitimate credentials under Section 2.1.2 below or where Registry Operator reasonably believes will violate the terms of Section 2.1.5. below; and, (c) Registry Operator may revoke access of any user if Registry Operator has evidence to support that the user has violated the terms of Section 2.1.5 below.

  • Joint Funded Project with the Ohio Department of Transportation In the event that the Recipient does not have contracting authority over project engineering, construction, or right-of- way, the Recipient and the OPWC hereby assign certain responsibilities to the Ohio Department of Transportation, an authorized representative of the State of Ohio. Notwithstanding Sections IV, VI.A., VI.B., VI.C., and VII of the Project Agreement, Recipient hereby acknowledges that upon notification by the Ohio Department of Transportation, all payments for eligible project costs will be disbursed by the Grantor directly to the Ohio Department of Transportation. A Memorandum of Funds issued by the Ohio Department of Transportation shall be used to certify the estimated project costs. Upon receipt of a Memorandum of Funds from the Ohio Department of Transportation, the OPWC shall transfer funds directly to the Ohio Department of Transportation via an Intra-State Transfer Voucher. The amount or amounts transferred shall be determined by applying the Participation Percentages defined in Appendix D to those eligible project costs within the Memorandum of Funds. In the event that the Project Scope is for right-of-way only, notwithstanding Appendix D, the OPWC shall pay for 100% of the right-of-way costs not to exceed the total financial assistance provided in Appendix C. APPENDIX D LOCAL SUBDIVISION CONTRIBUTION, PROJECT FINANCING AND EXPENSES SCHEME AND DISBURSEMENT RATIO

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Program Monitoring and Evaluation (c) The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Wire Unbundled DS1 Digital Loop This is a designed 4-wire Loop that is provisioned according to industry standards for DS1 or Primary Rate ISDN services and will come standard with a test point, OC, and a DLR. A DS1 Loop may be provisioned over a variety of loop transmission technologies including copper, HDSL-based technology or fiber optic transport systems. It will include a 4-Wire DS1 Network Interface at the End User’s location.

  • Xxxxxxxx Tobacco Co the jury returned a verdict in favor of the plaintiff, found the decedent, Xxxxxxx Xxxxxx, to be 30% at fault and RJR Tobacco to be 70% at fault, and awarded $7 million in compensatory damages and $8.5 million in punitive damages.

Time is Money Join Law Insider Premium to draft better contracts faster.