Frequency Modulation Sample Clauses

Frequency Modulation. The Power Plant shall participate in the frequency modulation of the power grid. The dispatching center may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the dispatching center. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code.
AutoNDA by SimpleDocs
Frequency Modulation. (1) Sanming Local Dispatching Agency may arrange the Power Plant to be the frequency modulation plant for the power grid of the local district in accordance with the actual conditions of the power grid in Sanming district, and the Power Plant must carry out the frequency modulation according to the dispatching directions and maintain the power frequency being within the provided range in the Dispatching Regulations.
Frequency Modulation. (1) The Power Plant shall participate in the frequency modulation of the power grid. The dispatching center may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the dispatching center. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code or the power frequency of the line communicated with the power grid of East China within the regulated scope.
Frequency Modulation. FM Hum and Noise – The ratio of suppression of frequency modulated hum and noise Hz – Hertz. IEC – International Electrotechnical Commission. LED- Light Emitting Diode. LCD – Liquid Crystal Display. LLRU – Lowest Level Replacement Unit. MHz – Megahertz. PCM – Pulse Code Modulation. PTT – Push-To-Talk. SINAD – Signal to Noise and Distortion Ratio. TIA – Telecommunications Industry Association. UHF – Ultra-High Frequency VHF – Very-High Frequency VSWR – Voltage Standing Wave Ratio APPLICABLE REGULATIONS AND STANDARDS The United States Code of Federal Regulations The vendor, and all equipment supplied by the vendor shall comply with The United States Code of Federal Regulations, Title 47 – Telecommunication, Chapter 1Federal Communications Commission Parts 2 and 90. Telecommunications Industry Association and DMS Standards TIA-603 Revision D, Land Mobile FM or PM – Communications Equipment – Measurement and Performance Standards. All radio products shall conform to the Department of Management Services’ (DMS) Technical Specifications as defined in performance characteristics. All radio equipment performance specifications listed below shall be met using TIA-603 Revision D measurement test procedures. The only exceptions shall be environmental specifications that must be met using MIL-STD-810 procedures. The DMS radio performance specifications are presented in table form in Attachment 1 at the end of this document. TIA-102 – Project 25 Series Documents. United States Military Standards MIL-STD-810, Environmental Engineering Considerations and Laboratory Test methods and standards identified in these technical specifications. Category 1 products, except Base Stations Repeaters and RF Control Stations, require MIL-STD-810 compliance; the vendor shall comply with the current version of MIL-STD-810, Revision G, of October 2008, including Change Notices. If the vendor is unable to comply with Revision G, they may, as an alternative, comply with Revision F, or Revision E, including change Notices. Specific MIL-STD-810 test methods and standards, listed below for each type of equipment (Category 1), shall be used in place of any corresponding specific TIA-603-D environmental standards to ensure that robust, rugged Public Safety Grade radios and associated equipment are procured. For any TIA-603-D environmental parameter where a MIL-STD-810 test method and standard is not specified below, the TIA-603-D standard shall be applied. For example, base stations are not ...
Frequency Modulation. Upon the agreement between and by Party A and Party B, the Power Station (generator units), upon the normal operation of the Cangxi grid, shall be considered as the power station free from frequency modulation; upon the isolated grid operation of the Cangxi grid, the Power Station(generator units) shall be considered as the first frequency modulation power station, the generator units shall be required to participate in the frequency modulation of the power system in accordance with the power system dispatching regulations.
Frequency Modulation. Theory of Frequency Modulation, characteristics of FM, Generation of FM, pre-emphasis, De-emphasis, wide &Narrowband FM Transmission, FM receiver. Unit V: A. Pulse Communication: Information Theory, Classification of pulse modulation, Sampling process, pulse amplitude modulation, PWM and PPM modulation pulse code modulation.

Related to Frequency Modulation

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Product Changes Vocera shall have the right, in its absolute discretion, without liability to End User, to update to provide new functionality or otherwise change the design of any Product or to discontinue the manufacture or sale of any Product. Vocera shall notify End User at least 90 days prior to the delivery of any Product which incorporates a change that adversely affects form, fit or function (“Material Change”). Vocera shall also notify End User at least 90 days prior to the discontinuance of manufacture of any Product. Notification will be made as soon as reasonably practical for changes associated with regulatory or health and safety issues.

  • Product ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User(s) shall have thirty (30) days from the date of delivery to accept hardware products and sixty (60) days from the date of delivery to accept all other Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty (30) day increment. Authorized User shall notify Contractor of acceptance upon successful completion of the documented installation test. Such cancellation shall not give rise to any cause of action against the Authorized User for damages, loss of profits, expenses, or other remuneration of any kind. If the Authorized User elects to provide a deficiency statement specifying how the Product fails to meet the specifications within the testing period, Contractor shall have thirty (30) days to correct the deficiency, and the Authorized User shall have an additional sixty (60) days to evaluate the Product as provided herein. If the Product does not meet the specifications at the end of the extended testing period, Authorized User, upon prior written notice to Contractor, may then reject the Product and return all defective Product to Contractor, and Contractor shall refund any monies paid by the Authorized User to Contractor therefor. Costs and liabilities associated with a failure of the Product to perform in accordance with the functionality tests or product specifications during the acceptance period shall be borne fully by Contractor to the extent that said costs or liabilities shall not have been caused by negligent or willful acts or omissions of the Authorized User’s agents or employees. Said costs shall be limited to the amounts set forth in the Limitation of Liability Clause for any liability for costs incurred at the direction or recommendation of Contractor.

  • Protocol The attached Protocol shall be an integral part of this Agreement.