Frequency controlled disturbance reserve Sample Clauses

Frequency controlled disturbance reserve. There shall be a frequency controlled disturbance reserve of such a volume and composition that a dimensioning fault does not cause a frequency below 49.5 Hz in the synchronous system. With regard to the frequency-dependence of consumption, the above requirement entails that the total frequency controlled disturbance reserve shall rise to a power which is equal to the dimensioning fault deducted by 200 MW. It must be able to utilise the frequency controlled disturbance reserve until the fast active disturbance reserve is activated. The activation of the frequency controlled disturbance reserve shall not result in other problems in the power system. When the transmission capacity is being determined, the location of the frequency controlled disturbance reserve shall be taken into account. Each subsystem shall have at least 2/3 of the frequency controlled disturbance reserve in its own system for potential splitting up and island operation.
AutoNDA by SimpleDocs
Frequency controlled disturbance reserve. The frequency controlled disturbance reserve is activated automatically at 49.9 Hz and fully activated at 49.5 Hz. At least 50 % shall be regulated out within 5 s and 100 % within 30 s. Joint requirement for the interconnected Nordic power system is approx 1,200 MW, depending on the relevant dimensioning fault. The service is closely linked to frequency controlled normal operation reserve, and the principle of exchange is the same. TSO Generation of system service Exchange between subsystems Energinet. dk East Disconnection of district heating. Turbine opening at thermal power plants. Droop control from thermal power plants. HVDC interventions. Yes
Frequency controlled disturbance reserve. If, in addition to this, Fingrid requests Reserve Holder to maintain more reserves, and, as a result of this, Reserve Holder has to change the target power of the reserve units, a transaction corresponding to the change of the target power shall be agreed at the price of regulating power.
Frequency controlled disturbance reserve. The reserve unit used in the maintenance of the frequency controlled disturbance reserve shall regulate almost linearly so that the activation begins when the frequency decreases below 49.90 Hz, and the full reserve shall be activated at a frequency of
Frequency controlled disturbance reserve. The frequency controlled disturbance reserve is the smaller of the following active powers: that which is activated at a stepped frequency deviation of -0.50 Hz in 30 seconds or that which is activated in five seconds multiplied by two. With relay-connected loads that follow the activation method of Table 1, the frequency controlled disturbance reserve is that change in active power which is activated within the required time at the selected disconnection step in accordance with Table 1.

Related to Frequency controlled disturbance reserve

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • What Forms of Distribution Are Available from a Xxxxxxxxx Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.

  • EMERGENCY CONTRACTS In the event that a disaster emergency is declared by Executive Order under Section 28 of Article 2-B of the Executive Law, or the Commissioner determines pursuant to his/her authority under Section 163(10)(b) of the State Finance Law that an emergency exists requiring the prompt and immediate delivery of Product, the Commissioner reserves the right to obtain such Product from any source, including but not limited to this Contract(s), as the Commissioner in his/her sole discretion determines will meet the needs of such emergency. Contractor shall not be entitled to any claim or lost profits for Product procured from other sources pursuant to this clause. The reasons underlying the finding that an emergency exists shall be included in the procurement record.

  • Withdrawal From Agreement A. Any Fund may elect to withdraw from this Agreement effective at the end of any monthly period by giving at least 90 days’ prior written notice to each of the parties to this Agreement. Upon the written demand of all other Funds which are parties to this Agreement a Fund shall withdraw, and in the event of its failure to do so shall be deemed to have withdrawn, from this Agreement; such demand shall specify the date of withdrawal which shall be at the end of any monthly period at least 90 days from the time of service of such demand.

  • CONDITIONS FOR EMERGENCY/HURRICANE OR DISASTER - TERM CONTRACTS It is hereby made a part of this Invitation for Bids that before, during and after a public emergency, disaster, hurricane, flood, or other acts of God that Orange County shall require a “first priority” basis for goods and services. It is vital and imperative that the majority of citizens are protected from any emergency situation which threatens public health and safety, as determined by the County. Contractor agrees to rent/sell/lease all goods and services to the County or other governmental entities as opposed to a private citizen, on a first priority basis. The County expects to pay contractual prices for all goods or services required during an emergency situation. Contractor shall furnish a twenty-four (24) hour phone number in the event of such an emergency.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • S M T W T F S ‌ 1 2 3 4 5 6 1 2 3 4 5 7 8 9 10 11 12 13 6 7 8 9 10 11 12‌ 21 22 23 24 25 26 27 20 21 22 23 24 25 26 28 29 27 28 29 30 31

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.