Foundation Drainage Sample Clauses

Foundation Drainage a) The Developer acknowledges that weeping tile connections to the sanitary sewer system within the Lands are prohibited and provisions must be made for alternate adequate foundation drainage. Accordingly, the Developer shall identify areas of high water table, which may result in year round sub-surface discharge to foundation drains and provide in these areas for a storm sewer connection to the property line of each lot.
AutoNDA by SimpleDocs

Related to Foundation Drainage

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Foundation In their respective agreements, the parties have recommended that a temporary manpower/resource pool of permanent employees be set up to cover normal absences (Section 20 of the Agreement). The parties agree that the employees working in such a pool can also be used to cover peak activities or in other temporary situations that call for extra xxxxxxx.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • School Improvement The conditions which follow shall govern employee participation in any and all plans, programs, or projects included in the terms, site-based decision making, school improvement, effective schools as provided in Act 197, P.A. 1987 (Section 15.1919 (919b) MSA) or other similar plans:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.