Fire Protection System Sample Clauses

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure – Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 6,000 Corn/DDGS Building 4,000 Xxxx Water Tank 3,500 Methanator Feed Tank 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 3,500 Thin Stillage Tank 3,500 Syrup Tank 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 All Other Areas 3,000 Table 2 Maintenance and Power Equipment – Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One...
AutoNDA by SimpleDocs
Fire Protection System. CMRL has obtained approval of from Tamilnadu Fire Services for existing integrated fire protection system for whole infrastructure of Station including area of licensed Kiosks Spaces. Any augmentation to existing fire protection system, if required due to renovation of licensed Kiosks Spaces shall be done by the licensee at his own risk & cost as per relevant BIS Code of Practice and norms of CMRL & Tamilnadu Fire Services.
Fire Protection System. 1. Sprinkler piping shall be terminated at the rising mains. Upright and pendant sprinklers shall be provided in the Demised Premises.
Fire Protection System. CMRL has obtained approval from Tamilnadu Fire Services for existing integrated fire protection system for whole infrastructure of Station including area of licensed Built up Bare Shell Shops/ Office Spaces. Underground water tank of 1 (one) lakh litre capacity and the other equipments including booster pump for fire safety are also available at station. Any augmentation to existing fire protection system, if required due to renovation of licensed Shops/ Office Spaces/space, shall be done by the licensee at his own risk & cost as per relevant BIS Code of Practice and norms of CMRL & Tamilnadu Fire Services.
Fire Protection System. A fire riser is constructed to meet applicable national and local Building code requirements. The fire protection water supply enters the Building underground at the fire control room on the main floor near the exterior of the Building. Wet standpipes rise vertically through the stairwells. Branch lines complete with sprinkler heads are installed in the building core. A main branch line (defined as 2- 1⁄2” in diameter or larger) is extended from the core into the tenant lease areas on each floor in two directions as part of the Base Building Improvements.
Fire Protection System. All relevant fire protection components (i.e., branch piping, sprinkler heads, fittings, drains, pumps, tanks, sensors, control panels) with necessary intelligence to produce accurate plans, elevations, building/wall sections, riser diagrams, and schedules. All fire protection piping shall be modeled.
Fire Protection System. (a) Check all hydrant valves and if any valve is open than close it. Check that all suction and delivery connections are properly made.
AutoNDA by SimpleDocs
Fire Protection System. 1. Upright sprinkler piping in the office area and fire rated doors for all shafts.
Fire Protection System. Base Fire Protection System with primary riser and all required components as approved by SF Building Department.
Fire Protection System. Base Fire Protection primary riser only as approved by SF Building Department.
Time is Money Join Law Insider Premium to draft better contracts faster.