Common use of Final Payment Clause in Contracts

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 33 contracts

Samples: School District Facilites and Special Projects Contract, School District Facilites and Special, www.fountaininngas.org

AutoNDA by SimpleDocs

Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 15 contracts

Samples: cdnsm5-ss10.sharpschool.com, resources.finalsite.net, cms4files.revize.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 14 contracts

Samples: ctuir.org, Agreement, Agreement

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 (1) the Contract has been fully performed by the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct nonconforming Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; andand (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows:

Appears in 14 contracts

Samples: Agreement, Agreement, www.durhamnc.gov

Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 11 contracts

Samples: cityofsewardne.gov, www.sunmandearborn.k12.in.us, campussuite-storage.s3.amazonaws.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2 of AIA Document A201–2017A232–2009, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 10 contracts

Samples: www.tippecanoe.in.gov, www.tippecanoe.in.gov, www.tippecanoe.in.gov

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen:

Appears in 10 contracts

Samples: Standard Agreement, Agreement (Old Line Bancshares Inc), www.sumtercountyfl.gov

Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Section 18.2, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 9 contracts

Samples: www.wiltonct.org, themuseumschool.org, www.gov.bm

Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen:

Appears in 7 contracts

Samples: Owner and Contractor Agreement, Owner and Contractor Agreement, Owner and Contractor Agreement

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 (1) the Contract has been fully performed by the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct nonconforming Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; and.

Appears in 6 contracts

Samples: www.durhamnc.gov, www.durhamnc.gov, www.durhamnc.gov

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen

Appears in 6 contracts

Samples: www.umms.org, www.unlv.edu, www.lexpublib.org

Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen:

Appears in 5 contracts

Samples: Form Construction Agreement, University of Nebraska, Form Construction Agreement

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen:

Appears in 4 contracts

Samples: Agreement, Urban Cool Network Inc, Corixa Corp

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work after final payment as provided in Article 12 Section 12.2.2 of AIA Document A201–2017the General Conditions, and to satisfy other requirements, if any, which arise or extend beyond final payment; and;

Appears in 3 contracts

Samples: resources.finalsite.net, resources.finalsite.net, resources.finalsite.net

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 (1) the Contractor Contract has been fully performed the Contract by Contractor except for the Contractor’s responsibility to correct nonconforming Work as provided in Article 12 13 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; andand (2) Contractor has satisfied all other conditions precedent as set forth in the General Conditions. To the extent required by Governmental Authority, final payment shall not be made until Contractor properly files and records a fully executed notice of completion, or its equivalent, with such Governmental Authority.

Appears in 3 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, minus disputed sums, authorized deductions, and liquidated damages, shall be made by the Owner to the Contractor when after .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct nonconforming Work as provided in Article 12 of AIA Document A201–2017, as modified by the Owner for the project, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has provided all documents required by Section 3.5 et seq. and 9.10.2 of AIA Document A201-2017; and

Appears in 3 contracts

Samples: www.bmtisd.com, www.bmtisd.com, staffordmsd.ss8.sharpschool.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen:

Appears in 3 contracts

Samples: Owner and Contractor Agreement, Agreement, 70.248.29.17:8085

Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 2 contracts

Samples: cms6.revize.com, Agreement

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 2 contracts

Samples: themcpgroup.com, themcpgroup.com

Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201–2017the General Conditions, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 2 contracts

Samples: county.milwaukee.gov, county.milwaukee.gov

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract Contract, except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017the General Conditions, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 2 contracts

Samples: hocmc.org, www.bidnet.com

Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, payment(for each Work, if multiple Projects) shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for including the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201– 2007, and , except for the Construction Manager's responsibility to satisfy other requirements, if any, which Owner agrees in writing necessarily extend beyond final payment; and;

Appears in 2 contracts

Samples: www.boarddocs.com, www.boarddocs.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct ions, and to Work after final payment as provided in Article 12 Section 12.2.2 of AIA Document A201–2017, and to satisfy other the General Xxxxxx requirements, if any, which arise or extend beyond final payment; andsatisfy other

Appears in 1 contract

Samples: resources.finalsite.net

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor as set forth in the General Conditions and when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2 of AIA Document A201–2017A232–2009, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: www.slsd.org

Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007 or elsewhere in the Contract Documents, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: crookcounty.k12.or.us

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 when: the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and.

Appears in 1 contract

Samples: www.oxford-ct.gov

Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2017 as modified by the parties, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: go.boarddocs.com

Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Section 18.2, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: homeforward.org

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work found after final payment to be defective or nonconforming as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which by their nature arise or extend beyond final payment; and;

Appears in 1 contract

Samples: sossamonconstruction.com

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work Work, as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: static1.squarespace.com

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made the Contractor when e by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Clauses 27-29 of AIA Document A201–2017HUD 5370 General Conditions, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: www.cookinlethousing.org

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–1997, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: www.co.kittitas.wa.us:443

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017the General Conditions, and to satisfy other requirementsand, if any, which extend beyond final payment; andand .2 a final Certificate for Payment has been issued by the Owner.

Appears in 1 contract

Samples: www.cookinlethousing.org

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, minus disputed sums, authorized deductions, and liquidated damages, shall be made by the Owner to the Contractor when after .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct noncomforming Work as provided in Article 12 of AIA Document A201–2017, as modified by the Owner for the project, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has provided all documents required by Section 3.5 et seq. and 9.10.2 of AIA Document A201-2017; and

Appears in 1 contract

Samples: p8cdn4static.sharpschool.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: www.gonzalesisd.net

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: author.acc.com

Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, as modified by the Owner, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: www.bidnet.com

Final Payment. § 5.2.1 5.3.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract and the entire Work is Finally Complete, as defined in Section 9.10.1.1 of the General Conditions, except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017the General Conditions, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: Agreement

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract , included completion or correction of all punchlist items, except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: www.eastcentral.edu

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct ions, and t Work after final payment as provided in Article 12 Section 12.2.2 of AIA Document A201–2017, and to satisfy other the General Xxxxxx requirements, if any, which arise or extend beyond final payment; o satisfy other .2 a final Certificate for Payment has been issued by the Architect and approved by the Owner; and

Appears in 1 contract

Samples: resources.finalsite.net

Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Section 18.2, and to satisfy other requirements, if any, which extend beyond final payment; and.

Appears in 1 contract

Samples: Agreement

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: www.cityofmitchell.org

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, as amended, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: p10cdn4static.sharpschool.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201–2007, as modified by Owner and attached hereto as Exhibit B, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: case.edu

Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, as amended, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: www.texasbar.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, as modified by Owner and attached hereto as Exhibit “C”; and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: agenda.hidalgocounty.us

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2 of AIA Document A201–2017A232–2009, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: www.shencsd.com

Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract SumSum minus authorized deductions and liquidated damages, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct nonconforming Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: agenda.webbcountytx.gov:8085

Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract Contract, except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;

Appears in 1 contract

Samples: mission.sfgov.org

Final Payment. § 5.2.1 4.4.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.