Final Interconnection and Operation Sample Clauses

Final Interconnection and Operation. The Interconnection Customer may operate the Small Generator Facility and interconnect with the EDC’s Electric Distribution System after all of the following have occurred:
AutoNDA by SimpleDocs
Final Interconnection and Operation. The interconnection member-consumer may operate the distributed generation facility and interconnect with the Cooperative’s electric distribution system after all of the following have occurred:
Final Interconnection and Operation. The interconnection customer may operate the distributed generation facility and interconnect with the utility’s electric distribution system after all of the following have occurred: a. Electrical Inspection: Upon completing construction, the interconnection customer shall cause the distributed generation facility to be inspected by the local electrical inspection authority, who shall establish that the distributed generation facility meets local code requirements. b.
Final Interconnection and Operation. The interconnection customer may operate the distributed generation facility and interconnect with Mt. Carmel Public Utility Co.’s electric distribution system after all of the following have occurred:

Related to Final Interconnection and Operation

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.